I <br /> Section 01 22 20 MEASUREMENT AND PAYMENT <br /> imported crushed surfacing top and base course for the Work as required, ' <br /> from a Contractor supplied source. <br /> The unit price for crushed surfacing top and base course also includes all <br /> costs for controlling moisture content. <br /> Also included in this bid item shall be the cost of all Work required to compact <br /> native subgrade soils, as well as to uniformly spread and compact the ' <br /> crushed surfacing material. <br /> Include in this bid item the cost of sprinkling during dry periods prior to <br /> placement of the crushed surfacing and while spreading and compacting the <br /> material. <br /> Bid Item 14. Gravel Borrow <br /> Measurement for Gravel Borrow shall be by the ton, recorded on certified <br /> weight tickets, and placed within the limits of dimensions defined in the Work, <br /> descriptions for other bid items, shown on the Plans, or COE Standard <br /> Drawings, or as otherwise approved by the Engineer. <br /> Measurement for gravel borrow shall be limited to maximum trench widths <br /> defined in the work descriptions for other bid items. ' <br /> The unit Contract Price per ton (TN)for"Gravel Borrow", based on certified <br /> weight tickets, shall be full compensation for all Work, labor, material, tools <br /> and equipment necessary to furnish imported gravel borrow where Engineer <br /> has determined native soils are not suitable for backfill, and other Work as <br /> required, from a Contractor-supplied source. <br /> The unit price for gravel borrow shall include all costs of furnishing, hauling, <br /> stockpiling, placing, grading and compacting the material in place. <br /> Bid Item 15. Foundation Material, Class A or B I <br /> Measurement for Foundation Material, Class A or B shall be by the ton, <br /> recorded on certified weight tickets, and placed within the limits of dimensions <br /> defined in the Work, descriptions for other bid items, shown on the Plans, or111 <br /> COE Standard Drawings, or as otherwise approved by the Engineer. <br /> The unit Contract Price per ton (TN) for"Foundation Material, Class A or B" <br /> shall constitute full compensation for all Work, labor, tools, materials and <br /> equipment required to furnish, place, and compact foundation material as <br /> specified in the Specifications, and as shown on the Plans. <br /> The costs for over-excavation, removal, haul, and disposal of unsuitable <br /> subgrade material below the pipe zone, pavement subgrade, and building is <br /> included under the Bi Item "Removal of Unsuitable Material". <br /> Bid Item 16. HMA, CL 1/2" PG 64-22 <br /> Measurement for HMA, CL 1/2" PG 64-22 shall be by the ton, recorded on <br /> certified weight tickets for HMA placed within the limits of dimensions defined <br /> in the Work or shown on the Plans, Specifications, or as otherwise approved <br /> by the Engineer. The measurement and payment limits for measuring this <br /> bid item shall be actual dimensions taken in the field. No deduction will be <br /> made for the weight of asphalt binder, blending sand, mineral filler, or other <br /> component of the mixture. <br /> Cityof Everett 01 22 20-10 January2022 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 I <br />