1 <br /> Section 01 22 20 MEASUREMENT AND PAYMENT <br /> 5. Core drilling and connecting PVC pipe to SDMH, filling annular space , <br /> with non-shrink grout (full depth) or with a mechanical seal and <br /> furnishing and installing flap gate or flap valve at end of pipe inside <br /> manhole, as shown on the Plans. <br /> 6. Excavate, install all piping, fittings, and other materials needed to <br /> connect the outside stairwell drain to the roof drain pipe as shown on <br /> the Plans. <br /> 7.. Steel sheeting for covering open excavations left overnight to protect <br /> public from injury and property damage. ' <br /> 8. Maintenance, restoration and/or relocation, if required, of existing <br /> culverts, storm drainage pipe, other utilities and structures affected by <br /> construction that are to remain. <br /> 9. Ethafoam pads or sand backfill between water main and other pipes. <br /> 10. Maintenance of existing utilities. I <br /> 11. Furnishing and installing marking tape and tracer wire over PVC pipe. <br /> 12. Furnishing, placing, and compacting Gravel Backfill for Drains around <br /> the 6-inch roof drain drain pipe as shown on the Drawings. <br /> 13. Extra depth, including excavation, backfill and compaction required to <br /> clear known buried utilities or other known obstacles. , <br /> 14. Work required to avoid unexpected or unforeseen utilities shall be <br /> paid for under the Bid Item "Resolution of Utility Conflicts. The costs <br /> for potholing and excavation required to determine exact depths and <br /> locations of other utilities shall be included with this Work with no <br /> direct compensation made. <br /> Bid Item 18. PVC Pipe SDR 35 Perforated, 6-Inch Diam. , <br /> Per linear foot pipe measurement shall be based on the slope distance from <br /> point to point. The point of beginning or ending of measurement in any 111 <br /> particular run of pipe shall be the vertical intersection of the centerline of the <br /> pipe measured with the centerline of the intersection pipe, or with the <br /> beginning or ending of any new linear length of valves or couplings contained <br /> within the measured length. At changes in pipe size connected by a reducer, <br /> the point of measurement shall be taken as the midpoint of the reducer. <br /> The unit Contract Price per linear foot (LF)for"PVC Pipe SDR 35 Perforated 111 <br /> Wall, 6-Inch Diam", shall constitute full compensation for all labor, materials, <br /> tools, and equipment necessary to furnish and install the pipe, including <br /> electrical building footing drains, as shown on the Plans or as required by the <br /> Specifications, and all fittings required for complete installation of the pipe as <br /> shown on the Plans and specified herein, and additionally, shall include, but <br /> not be limited to, the following: <br /> 1. This shall include, but not be limited to, removal and disposal of the <br /> existing asphalt concrete pavement, sidewalk, curb, thrust blocks, <br /> miscellaneous landscaping, and sod as indicated on the Plans. <br /> City of Everett 01 22 20-12 January 2022 <br /> Evergreen Pump Station Modifications <br /> UP3747-3 ' <br />