My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Parametrix Inc. 3/24/2022
>
Contracts
>
6 Years Then Destroy
>
2025
>
Parametrix Inc. 3/24/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2022 3:05:26 PM
Creation date
4/22/2022 3:02:59 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Parametrix Inc.
Approval Date
3/24/2022
Council Approval Date
3/23/2022
End Date
12/31/2025
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
I-5 & US-2 Interchange Justification Report
Tracking Number
0003312
Total Compensation
$2,047,633.10
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF WORK(continued) <br /> between the built environment and active transportation travel patterns.A composite score will be calculated to <br /> determine the relative attractiveness of one area over another for active transportation.The following <br /> characteristics may be considered in developing the active transportation demand index: <br /> • Proximity to attractions <br /> • Proximity to schools <br /> • Proximity to parks <br /> • Proximity to transit <br /> • Population density <br /> • Employment density <br /> • Diversity of land use <br /> • Age(8-80) <br /> The consultant will prepare a heat map that shows the areas that are likely to have a high demand for active <br /> transportation in the study area. <br /> The consultant will also review the most recent(pre-Covid) 5-years of crash data to identify potential crash trends <br /> for active transportation users.The consultant will develop a map depicting the location of crashes involving <br /> nonmotorized users and will summarize crash trends. <br /> Assumptions <br /> • The active transportation network inventory will be developed using GIS <br /> • Two review cycles will be completed <br /> Deliverables <br /> • Draft existing condition active transportation sections of the report <br /> • Final existing condition active transportation sections of the report <br /> Design <br /> Approach <br /> The Consultant will organize,summarize,and document data collected in Subtask 03-01 as it applies to the <br /> project area.The data will include:existing bridge/structural conditions;interchange design issues; vertical and <br /> horizontal boundaries to use as guidance for design options;shoulder and lane widths; presence and type of <br /> barriers,guardrails and walls;existing pavement types, depths and conditions;existing underground utilities, <br /> poles,columns and other roadside features that may impact the feasibility of design alternatives, operations and <br /> maintenance. <br /> The data will be summarized in a Draft Design Criteria Table that will document existing design deficiencies and <br /> identify proposed standards to be utilized when developing conceptual design alternatives. <br /> Assumptions: <br /> NA <br /> City of Everett 5541844828 <br /> US 2/1-5 Interchange Planning Study 16 July 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.