Laserfiche WebLink
SCOPE OF WORK(continued) <br /> Assumptions <br /> • The transit network inventory will be developed using GIS <br /> • Two review cycles will be completed <br /> • The draft transit no-build section of the report will be reviewed by the Client and support team <br /> • Comments will be addressed and shared at the Support Team meeting or using email to confirm <br /> responses to comments. <br /> Deliverables <br /> • Final transit no-build section of the report <br /> Active Transportation <br /> Approach <br /> The consultant will evaluate the Future No-Build Active Transportation Network by incorporating active <br /> transportation facility improvements that are anticipated to occur within the study area.The consultant will <br /> develop a No-Build Active Transportation Network using GIS that will include pedestrian and bicycle facilities as <br /> well as projected user volumes. Future active transportation user volumes will be estimated using a growth rate <br /> based on anticipated land use changes and population and employment growth. <br /> The consultant will also identify projected areas of high demand for active transportation based on changes in <br /> population and employment densities,The consultant will re-evaluate the active transportation demand index <br /> based on anticipated changes in land use and population and density.The consultant will prepare a heat map that <br /> shows the areas that are anticipated to have a high demand for active transportation in the study area. <br /> Assumptions <br /> • The active transportation network inventory will be developed using GIS <br /> • Two review cycles will be completed <br /> Deliverables <br /> • Draft active transportation no-build section of the report <br /> • Final active transportation no-build section of the report <br /> Design <br /> Approach <br /> The consultant will evaluate the Future No-Build Transportation/Transit by incorporating transit and roadway <br /> improvements that are anticipated to occur within the study area.The consultant will develop a No-Build <br /> transportation/transit Network using GIS that will include roadway improvement and HOV/Transit facilities as <br /> well as projected transit routes. Future active transportation user volumes will be estimated using a growth rate <br /> based on anticipated land use changes and population and employment growth. Assumptions <br /> • na <br /> City of Everett 5541844828 <br /> US 2/I-5 Interchange Planning Study 20 July 2021 <br />