My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Parametrix Inc. 3/24/2022
>
Contracts
>
6 Years Then Destroy
>
2025
>
Parametrix Inc. 3/24/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2022 3:05:26 PM
Creation date
4/22/2022 3:02:59 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Parametrix Inc.
Approval Date
3/24/2022
Council Approval Date
3/23/2022
End Date
12/31/2025
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
I-5 & US-2 Interchange Justification Report
Tracking Number
0003312
Total Compensation
$2,047,633.10
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF WORK(continued) <br /> Assumptions <br /> • The transit network inventory will be developed using GIS <br /> • Two review cycles will be completed <br /> • The draft transit no-build section of the report will be reviewed by the Client and support team <br /> • Comments will be addressed and shared at the Support Team meeting or using email to confirm <br /> responses to comments. <br /> Deliverables <br /> • Final transit no-build section of the report <br /> Active Transportation <br /> Approach <br /> The consultant will evaluate the Future No-Build Active Transportation Network by incorporating active <br /> transportation facility improvements that are anticipated to occur within the study area.The consultant will <br /> develop a No-Build Active Transportation Network using GIS that will include pedestrian and bicycle facilities as <br /> well as projected user volumes. Future active transportation user volumes will be estimated using a growth rate <br /> based on anticipated land use changes and population and employment growth. <br /> The consultant will also identify projected areas of high demand for active transportation based on changes in <br /> population and employment densities,The consultant will re-evaluate the active transportation demand index <br /> based on anticipated changes in land use and population and density.The consultant will prepare a heat map that <br /> shows the areas that are anticipated to have a high demand for active transportation in the study area. <br /> Assumptions <br /> • The active transportation network inventory will be developed using GIS <br /> • Two review cycles will be completed <br /> Deliverables <br /> • Draft active transportation no-build section of the report <br /> • Final active transportation no-build section of the report <br /> Design <br /> Approach <br /> The consultant will evaluate the Future No-Build Transportation/Transit by incorporating transit and roadway <br /> improvements that are anticipated to occur within the study area.The consultant will develop a No-Build <br /> transportation/transit Network using GIS that will include roadway improvement and HOV/Transit facilities as <br /> well as projected transit routes. Future active transportation user volumes will be estimated using a growth rate <br /> based on anticipated land use changes and population and employment growth. Assumptions <br /> • na <br /> City of Everett 5541844828 <br /> US 2/I-5 Interchange Planning Study 20 July 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.