My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Parametrix Inc. 3/24/2022
>
Contracts
>
6 Years Then Destroy
>
2025
>
Parametrix Inc. 3/24/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2022 3:05:26 PM
Creation date
4/22/2022 3:02:59 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Parametrix Inc.
Approval Date
3/24/2022
Council Approval Date
3/23/2022
End Date
12/31/2025
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
I-5 & US-2 Interchange Justification Report
Tracking Number
0003312
Total Compensation
$2,047,633.10
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCOPE OF WORK(continued) <br /> Structural design considerations, including bridges, retaining walls,and noise walls,may include identifying the <br /> need for structural components, and structural assessments at a planning level for up to two(2)alternatives in <br /> support of the Preferred Alternative Selection Screening in support of the opinion of cost. The Consultant will <br /> evaluate existing structural as built drawings to determine what modifications to the existing interchange could <br /> be accomplished without a full rebuild. This information will help determine potential costs as well as support <br /> possible construction phasing discussion. <br /> Assumptions: <br /> • The Consultant will utilize AutoCAD 2020 for all CADD drawings. <br /> • The City will provide all related CADD mapping used in previous studies for use by the Consultant. No new <br /> CADD mapping will be produced in this scope of work. If necessary,the City will convert CADD mapping <br /> files to AutoCAD format prior to sending to the Consultant. Conversions to or from other CADD formats is <br /> not included in this scope. <br /> • The Consultant will combine CADD files into a single file system for use through the project duration. <br /> • WSDOT's Design Manual and Highway Runoff Manual will serve as the primary guidance for design <br /> standards,except for City of Everett local streets which will follow City of Everett Design and Construction <br /> Standards and Ecology's 2019 Stormwater Management Manual for Western Washington. <br /> • The Consultant will develop up to fifteen (15)planning study level of detail roadway layouts to be <br /> evaluated in the First Level Screening. The roadway layouts for this effort will not include detailed <br /> roadway geometry, and will not include structural,stormwater or utilities design considerations. Up to six <br /> (6)alternatives will be carried into the Second Level Screening.Additional design development for these <br /> six(6) alternatives is not included in this scope. <br /> • The Consultant will refine centerline layouts for up to 6 alternatives to be carried into second level <br /> screening. <br /> • The Consultant will refine the design of up to two(2) alternatives in support of the Preferred Alternative <br /> Selection Screening.Additional engineering/design considerations will include detailed horizontal <br /> roadway geometry and roadway cross-sections identifying lane and shoulder width and right-of-way <br /> limits.The roadway layouts for this effort will also include structural,drainage and utilities considerations. <br /> • Vertical roadway profiles,superelevations,surfacing type and depth,and guardrail design is not included <br /> in this scope. <br /> • The detailed development of conceptual typical structural sections and layouts is not included in this <br /> scope. <br /> • The detailed design of collection and conveyance systems,flow control,water quality treatment, retrofit <br /> analysis, and onsite stormwater management best management practices(BMPs)are not included in this <br /> scope. <br /> • Cost estimating sheets will be updated to include current costs and updated risk through conversations <br /> with the City, County,and State. <br /> • Preliminary high/medium/low cost estimates will be provided for each of the 15 alternatives evaluated in <br /> first-level screening. <br /> • Planning-level cost estimates will be provided for each of the 6 alternatives carried into second-level <br /> screening. <br /> Deliverables <br /> • Draft and Final Design section of the final report <br /> City of Everett 5541844828 <br /> US 2/1-5 Interchange Planning Study 25 July 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.