Laserfiche WebLink
• <br /> 4. See changes added to section on Sheet 10. <br /> 5. See changes added to detail on Sheet 10. <br /> 6. There is an existing guard rail in the existing Control Room with no <br /> proposed change. <br /> 7. The only new stair in Phase One is as described in above Occupancy Item <br /> #2. See details added to Sheet 10 for handrails and returns. <br /> 8. See section already given on Sheet 9 and new section added to Sheet 10. <br /> The only new stair has a total rise (floor to floor) of 200 inches. With 29 <br /> risers at 6.897 inches per riser, -this will comply with the standard. <br /> 9. The new roof for the existing control room will be of one-hour <br /> construction, which is given with the callouts in its construction as given in <br /> detail D on Sheet 10. <br /> 10. See detail K added to Sheet 10. <br /> Accessibility: <br /> 1. DNA to Phase One <br /> 2. Signage, etc, will be part of Phase Two <br /> 3. There really will be no new stair where none existed before. <br /> Deferred Mechanical Permit Applications <br /> 1. OK <br /> 2. DNA to Phase One <br /> Also, in response to your email, dated 1-23-17: <br /> The fire escape item will be addressed in Phase Two. <br /> There are no new stairs proposed at the control or basement. Being that they, as <br /> existing, have already been permitted, then we should have no new requirements <br /> regarding them. <br /> See new doors added at the bottom of the basement stair. <br />