Laserfiche WebLink
i • <br /> • <br /> Mr. Joey Perez <br /> Plan Check Number: B2010-011, First Building Review <br /> October 10, 2020 <br /> provided that the clearance per Section 604.3 is provided and the grab bar dimensions and <br /> locations are specified in the drawings. Alternatively, grab bars complying with Section R325.8 <br /> should be shown. <br /> Structural <br /> 1. The project includes removal of interior walls that are presumed to be non-bearing. See <br /> Section 106.1.1 and Chapter 8. The following comments should be addressed: <br /> a. The roof framing over the work area should be shown to verify walls are non-load bearing. <br /> b. A note should be provided in the drawings requiring the contractor to verify wall are non- <br /> loading bearing prior to demolition. <br /> 2. Structural details for the new opening in the exterior wall at the office should be provided. See <br /> Sections R602.3 and R602.7, and Table R602.3(1). <br /> This review has been performed for general compliance with the building codes as adopted and <br /> amended by the state of Washington and the city of Everett. Corrections and comments made <br /> during the review process do not relieve the project from compliance with code and permit <br /> requirements. The designers-of-record are responsible for a complete design in accordance with <br /> the laws of the state of Washington. <br /> If you have any questions or require additional clarification, please contact us. <br /> Respectfully, <br /> Drew Martin, P.E., S.E. <br /> Associate Engineer/ Commercial Plans Examiner <br /> (425)257-8813 <br /> dmartin@everettwa.gov <br /> O3200 Cedar Street 0 425.257.8810 O everetteps@everettwa.gov <br /> Everett,WA 98201 425.257.8857 fax everettwa.gov/permits <br /> Page 3 of 3 <br />