My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 5/9/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
IMCO General Construction 5/9/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 8:45:49 AM
Creation date
5/13/2022 8:42:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
5/9/2022
Council Approval Date
5/4/2022
End Date
4/1/2023
Department
Administration
Department Project Manager
John Nottingham
Subject / Project Title
WFP Phase 2 Capital Upgrades
Tracking Number
0003343
Total Compensation
$2,723,318.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett,Washington I Water Filter Plant- Phase 2 Capital Upgrades PDB Project <br /> Progressive Design-Build Contract I Draft Exhibit C. Phase 1 Scope of Services <br /> Deliverables: <br /> 1. Workshop materials and handouts <br /> 2. Draft and final workshop notes, decision log, and action log <br /> 3. Draft and final Basis of Design Report <br /> Task 5— Design <br /> Subtask 5.1 - 60 Percent Design <br /> Design-Builder shall develop and submit a draft 60 Percent Design Submittal to the City for <br /> review and comment. The 60 Percent Design Submittal shall include all documents, drawings <br /> and specifications required under this task or identified as being submitted along with the 60 <br /> Percent Design Submittal under other tasks. At a minimum, the Draft 60 Percent Design <br /> Submittal shall include: <br /> 1. Narrative description of revisions to the design and construction concepts since the <br /> Design Approach/Concept Workshop, including any revisions to design criteria, and <br /> rationale for changes <br /> 2. Screenhouse valves replacement design, including <br /> a. Construction sequencing and multi-party coordination plan <br /> b. Design criteria for valves, actuators, pipes, fittings, and flexible connectors as <br /> applicable <br /> c. Design criteria for valve vault(s) <br /> d. Materials and methods of replacement/installation <br /> e. Demolition concepts and plans for maintaining full operations of the Water <br /> Filter Plant while avoiding the introduction of debris, dust, and any other <br /> foreign materials into plant infrastructure <br /> f. Dewatering and shoring concepts <br /> g. Structural design calculations <br /> h. Seismic design criteria and coordination with geotechnical exploration results <br /> Vendor supporting information for equipment and materials <br /> 3. PUD return line flow meter design, including <br /> a. Construction sequencing and multi-party coordination plan <br /> b. Design criteria for flow meter, pipes, fittings, and flexible connectors as <br /> applicable <br /> c. Design criteria for flow meter vault <br /> d. Materials and methods of installation <br /> e. Demolition concepts and plans for maintaining full operations of the Water <br /> Filter Plant while avoiding the introduction of debris, dust, and any other <br /> Dewatering and shoring concepts <br /> f. Structural design calculations <br /> g. Seismic design criteria and coordination with geotechnical exploration results <br /> h. Vendor supporting information for equipment and materials <br /> 4. PUD return line control valves design, including <br /> Page 8 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.