My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 5/9/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
IMCO General Construction 5/9/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 8:45:49 AM
Creation date
5/13/2022 8:42:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
5/9/2022
Council Approval Date
5/4/2022
End Date
4/1/2023
Department
Administration
Department Project Manager
John Nottingham
Subject / Project Title
WFP Phase 2 Capital Upgrades
Tracking Number
0003343
Total Compensation
$2,723,318.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett,Washington I Water Filter Plant- Phase 2 Capital Upgrades PDB Project <br /> Progressive Design-Build Contract I Draft Exhibit C. Phase 1 Scope of Services <br /> d. Design criteria for storage tank foundation and supports including seismic <br /> stabilization design criteria as applicable <br /> e. Material and methods of replacement/installation <br /> f. Demolition concepts and plans for maintaining full operations of the Water <br /> filter Plant while avoiding the introduction of debris, dust, and any other <br /> Structural design calculations <br /> g. Coating/sealant and corrosion protection criteria <br /> h. Vendor supporting information for equipment and materials <br /> 8. Hydrofluosilicic acid (fluoride) storage tanks replacement and fluoride building HVAC <br /> improvements design, including: <br /> a. Construction sequencing <br /> b. Design criteria for chemical storage tanks, piping, level sensors, and pumps <br /> as applicable <br /> c. Design criteria for building HVAC improvements including mechanical and <br /> electrical design criteria <br /> d. Design criteria for storage tank foundation and supports including seismic <br /> stabilization design criteria as applicable <br /> e. Material and methods of replacement/installation <br /> f. Demolition concepts and plans for maintaining full operations of the Water <br /> filter Plant while avoiding the introduction of debris, dust, and any other <br /> Structural design calculations <br /> g. Vendor supporting information for equipment and materials <br /> 9. Clearwell flow diversion structure valves replacement design, including <br /> a. Construction sequencing <br /> b. Design criteria for valves, actuators, pipes, fittings, and flexible connectors as <br /> applicable <br /> c. Design criteria for valve vaults <br /> d. Materials and methods of replacement/installation <br /> e. Demolition concepts and plans for maintaining full operations of the Water <br /> filter Plant while avoiding the introduction of debris, dust, and any other <br /> Dewatering and shoring concepts <br /> f. Structural design calculations <br /> g. Seismic design criteria and coordination with geotechnical exploration results <br /> h. Coating/sealant and corrosion protection criteria <br /> Vendor supporting information for equipment and materials <br /> 10. East clearwell gate improvements design, including: <br /> a. Construction sequencing <br /> b. Design criteria for gates, frames, and actuators including mechanical and <br /> electrical design criteria <br /> c. Materials and methods of replacement/installation <br /> d. Demolition concepts and plans for maintaining full operations of the Water <br /> filter Plant while avoiding the introduction of debris, dust, and any other <br /> Structural design calculations <br /> Page 10 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.