My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 5/9/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
IMCO General Construction 5/9/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 8:45:49 AM
Creation date
5/13/2022 8:42:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
5/9/2022
Council Approval Date
5/4/2022
End Date
4/1/2023
Department
Administration
Department Project Manager
John Nottingham
Subject / Project Title
WFP Phase 2 Capital Upgrades
Tracking Number
0003343
Total Compensation
$2,723,318.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett,Washington I Water Filter Plant- Phase 2 Capital Upgrades PDB Project <br /> Progressive Design-Build Contract I Draft Exhibit C. Phase 1 Scope of Services <br /> e. Coating/sealant and corrosion protection criteria <br /> f. Vendor supporting information for equipment and materials <br /> 11. Design planning for protection and repair of existing infrastructure during <br /> construction <br /> 12. Design planning for constructability of improvements <br /> 13. Summary of status of any applicable permits <br /> 14. Updated Phase 2 cost model based on 60 percent design <br /> 15. Updated Phase 2 schedule based on 60 percent design <br /> 16. Preliminary Design and Construction Phasing Plan, including plans for procurement <br /> of any long-lead items, and any suggested early works packages. <br /> 17. Updated Project Risk Register <br /> 18. Preliminary Self-Performance and Subcontracting Plan, identifying work packages <br /> planned to be self-performed and subcontracted, the value of each package, whether <br /> those packages are being procured competitively or sole sourced, description of <br /> approach to procurement for competitive packages, and identity of subcontractor for <br /> sole sourced packages. Plan shall identify plans for local and WMBE outreach and <br /> subcontracting. <br /> 19. All internal QA/QC Review documentation, including signature pages documenting <br /> completed reviews, and if requested by the City, reviewer comments and design <br /> team responses. <br /> 20. Plans and specifications consistent with a 60 percent design milestone, including at a <br /> minimum the items identified in Table 1. <br /> Notes: Items 1 through 20 may be combined into common deliverables as it makes sense for <br /> design purposes. Design criteria may be listed in specifications. <br /> Table 1. 60% Drawings and Specifications — Minimum Requirements <br /> Drawings Specifications <br /> General Requirements <br /> Cover Sheet <br /> List of Drawings (May be combined with <br /> Cover Sheet) <br /> List of Abbreviations (May be combined with <br /> Cover Sheet) <br /> General <br /> General legends and abbreviations Preliminary general specifications (all <br /> sections) <br /> General Project Plan(s) <br /> • Based on record drawings —show <br /> existing utilities and structures. <br /> • Locate contractor staging areas and <br /> access routes. <br /> • Identify construction fencing and other <br /> access control measures, including plans <br /> for preserving City operations access. <br /> Page 11 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.