My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 5/9/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
IMCO General Construction 5/9/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 8:45:49 AM
Creation date
5/13/2022 8:42:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
5/9/2022
Council Approval Date
5/4/2022
End Date
4/1/2023
Department
Administration
Department Project Manager
John Nottingham
Subject / Project Title
WFP Phase 2 Capital Upgrades
Tracking Number
0003343
Total Compensation
$2,723,318.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett,Washington I Water Filter Plant- Phase 2 Capital Upgrades PDB Project <br /> Progressive Design-Build Contract I Draft Exhibit C. Phase 1 Scope of Services <br /> Construction Staging Plan and Sequencing <br /> Plan <br /> • Show construction staging and storage <br /> areas and expected construction access <br /> Architectural <br /> Architectural demolition plans Preliminary architectural specifications (all <br /> sections) <br /> Exterior elevations <br /> Building floor plans <br /> Building roof/wall plans <br /> Details <br /> Civil <br /> Civil demolition plans Preliminary civil specifications (all sections) <br /> TESC plans <br /> Dewatering/shoring plans <br /> Site utility plans <br /> Paving and grading plans <br /> Valve, vault, flow meter, and piping plans <br /> Site restoration plan <br /> Details <br /> Structural <br /> Structural demolition plans Preliminary structural specifications (all <br /> sections) <br /> Valve vault plans and sections <br /> Geotechnical plans and details <br /> Seismic stabilization plans and sections <br /> Flocculation basin plans and sections <br /> Alum and polymer building plans <br /> Fluoride building plans <br /> Clearwell gate plans <br /> Details <br /> Mechanical <br /> Mechanical demolition plans Preliminary mechanical specifications (all <br /> sections) <br /> Valve and actuator plans <br /> Old #5 line cross connect plans <br /> Flow meter plans <br /> Flocculation basin and mixer plans <br /> Alum and polymer delivery system plans <br /> Fluoride delivery system plans <br /> Fluoride building HVAC plans <br /> Clearwell gate plans <br /> Details <br /> Electrical, Instrumentation, and Controls <br /> Electrical, instrumentation, and controls Preliminary electrical, instrumentation, and <br /> demolition plan controls specifications (all sections) <br /> Valve and actuator plans <br /> Flocculation basin and mixer plans <br /> Page 12 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.