My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
IMCO General Construction 5/9/2022
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2023
>
IMCO General Construction 5/9/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 8:45:49 AM
Creation date
5/13/2022 8:42:22 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction
Approval Date
5/9/2022
Council Approval Date
5/4/2022
End Date
4/1/2023
Department
Administration
Department Project Manager
John Nottingham
Subject / Project Title
WFP Phase 2 Capital Upgrades
Tracking Number
0003343
Total Compensation
$2,723,318.68
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett,Washington I Water Filter Plant- Phase 2 Capital Upgrades PDB Project <br /> Progressive Design-Build Contract I Draft Exhibit C. Phase 1 Scope of Services <br /> Alum and polymer delivery system plans <br /> Alum and polymer level sensor plans <br /> Alum and polymer building plans <br /> Fluoride delivery system plans <br /> Fluoride level sensor plans <br /> Fluoride building HVAC plans <br /> Fluoride building plans <br /> Clearwell gate actuator plans <br /> Details <br /> Notes: Drawings may be combined into common drawings as it makes sense for design <br /> purposes. <br /> The Design-Builder shall submit three (3) paper copies of the draft 60 Percent Design <br /> Documents and one electronic copy in Adobe PDF and MS Word format. <br /> Deliverables: <br /> 1. 60 Percent Design Package <br /> Subtask 5.2 - 90 Percent Design <br /> Design-Builder shall develop and submit a draft 90 Percent Design Submittal to the City for <br /> review and comment. The 90 Percent Design Submittal shall include all documents, drawings <br /> and specifications required under this task. At a minimum, the 90 Percent Design Submittal <br /> shall include: <br /> 1. Narrative description of revisions to the design and construction concepts since the <br /> 60 percent design, including any revisions to design criteria, and rationale for <br /> changes <br /> 2. Summary of status of any applicable permits <br /> 3. Updated Phase 2 schedule based on 90 percent design <br /> 4. Updated Design and Construction Phasing Plan, including plans for procurement of <br /> any long-lead items. Include a brief narrative describing changes to the Plan (if any) <br /> from the 60 percent submittal. <br /> 5. All internal QA/QC Review documentation, including signature pages documenting <br /> completed reviews, and if requested by the City, reviewer comments and design <br /> team responses. <br /> 6. Plans and specifications consistent with a 90 percent design milestone, including at a <br /> minimum the items identified in Table 2. <br /> Table 2. 90% Drawings and Specifications — Minimum Requirements <br /> Drawings Specifications <br /> All drawings included in 60 percent submittal, All specifications included in 60 percent <br /> and any additional drawings identified by the submittal, and any additional specifications <br /> Page 13 of 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.