My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DKS Associates 5/6/2022
>
Contracts
>
6 Years Then Destroy
>
2023
>
DKS Associates 5/6/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 10:03:55 AM
Creation date
5/13/2022 10:03:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
DKS Associates
Approval Date
5/6/2022
End Date
5/31/2023
Department
Public Works
Department Project Manager
Jeremy Wheeler
Subject / Project Title
Traffic Signal Improvements - Design Services
Public Works WO Number
PW3737, PW3790
Tracking Number
0003347
Total Compensation
$106,487.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Public involvement coordination and meeting, if needed. <br /> • Environmental permit applications, if required. <br /> • Stakeholder coordination. The consultant will assist as needed. <br /> • City of Everett electronic CAD standards and details. <br /> 1. Project Management <br /> The estimated project design duration is eight (8) months, and construction is estimated <br /> to start in fall of 2022. <br /> The CONSULTANT will provide project management administrative services including: <br /> • Project set-up and execute agreement <br /> • Execution of Subconsultant agreements <br /> • Preparation and delivery of monthly progress reports and invoices <br /> • Record keeping and project closeout <br /> Provide overall project management including: <br /> • Project staff management and coordination <br /> • Subconsultant management and coordination <br /> • Prepare and maintain project schedule <br /> • Schedule and budget monitoring <br /> The CONSULTANT will manage and coordinate the project, including attendance at <br /> virtual meetings with City staff. Up to 12 bi-weekly online meetings are assumed, which <br /> include an initial kick-off meeting, an over-the-should review of preliminary design layout <br /> and engineer's estimate, and three (3) meetings to resolve City and stakeholder <br /> comments on the three (3) PS&E submittals. Up to two (2) CONSULTANT staff are <br /> expected at each formal meeting. <br /> All email correspondence regarding the project will include the City project manager. The <br /> CONSULTANT will prepare and submit invoices and progress summaries once per <br /> month by the fifth business day of each month. <br /> QUALITY ASSURANCE /QUALITY CONTROL <br /> The CONSULTANT will provide internal QA/QC reviews of the following major work <br /> elements prior to submittal to the City. Provide senior review of 60%, 90% and final Plans, <br /> specifications, estimates, and calculations prior to scheduled constructability reviews. <br /> City of Everett 3 DKS <br />
The URL can be used to link to this page
Your browser does not support the video tag.