My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
DKS Associates 5/6/2022
>
Contracts
>
6 Years Then Destroy
>
2023
>
DKS Associates 5/6/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2022 10:03:55 AM
Creation date
5/13/2022 10:03:18 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
DKS Associates
Approval Date
5/6/2022
End Date
5/31/2023
Department
Public Works
Department Project Manager
Jeremy Wheeler
Subject / Project Title
Traffic Signal Improvements - Design Services
Public Works WO Number
PW3737, PW3790
Tracking Number
0003347
Total Compensation
$106,487.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o Evaluate and upgrade curb ramps at the NE, and SE corner as needed. <br /> o Install APS pushbutton and posts as needed to meet ADA requirements. <br /> o Traffic signal controller cabinet and foundation will remain. <br /> • At W Marine View Dr/California St, ADA curb ramp improvements at completing <br /> a resurface of South 12th Street. <br /> o Replace two concrete mast arm poles with type 3 mast arm poles. <br /> o Traffic signal controller cabinet and foundation will remain. <br /> The 60% design includes the following plan sheets: <br /> Cover 1 <br /> Legend and Notes 1 <br /> Survey and alignment 2 <br /> Legend and notes 1 <br /> Demolition & Site preparation 2 <br /> Intersection layout 2 <br /> Curb ramp details 3 <br /> Traffic Signal Layout 2 <br /> Signal Detection Plan 2 <br /> Signal Phasing and Wire Schedule 2 <br /> Signal Details 1 <br /> Pole Schedules 2 <br /> Total Number of Sheets 21 <br /> The CONSULTANT will prepare 60% specifications for Divisions 2 through9. The City <br /> will be responsible for the preparation of Division 1 of the project specifications. <br /> The CONSULTANT will perform quantity takeoffs and prepare a 60% estimate of <br /> probable construction costs. <br /> Deliverables: <br /> • 10% design layout exhibits. <br /> • 60% PS&E design package (PDF and Excel formats and CAD files). <br /> • Street lighting analysis memo. <br /> 6. 90% DESIGN SUBMITTAL <br /> City of Everett 6 DKS <br />
The URL can be used to link to this page
Your browser does not support the video tag.