My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2823 HOYT AVE EVERPARK GATEWAY GARAGE 2022-05-23
>
Address Records
>
HOYT AVE
>
2823
>
EVERPARK GATEWAY GARAGE
>
2823 HOYT AVE EVERPARK GATEWAY GARAGE 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 2:56:08 PM
Creation date
5/23/2022 2:55:40 PM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
2823
Tenant Name
EVERPARK GATEWAY GARAGE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> r.�.ry ,..11.71 11 1716 W t C <br /> .,5.259,,,,, (_) 2r:c< '.VA9 2G1 <br /> February 27, 2019 <br /> Drew Martin —Commercial Plans Examiner <br /> City of Everett Planning and Public Works. <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> RE: Everpark parking garage repairs, B11812-022 <br /> Dear Mr. Martin: <br /> This letter contains responses to your Architectural building review comments letter dated January <br /> 14, 2019. Review comments are listed below with our responses in Italics below. <br /> ARCHITECTURAL <br /> 1. Work on existing buildings shall comply with the IEBC. The IEBC provides three <br /> alternative methods for performing work: The Prescriptive Compliance Method (Section <br /> 301.1.1), the Work Area Method (301.1.2), and the Performance Compliance Method <br /> (301.1.3). The method selected for the project should be specified in the General Notes <br /> on Sheets A1.11 and A1.12. A statement should be provided clarifying the types of work <br /> that are included in the project (e.g., repairs, additions, change of occupancy, etc.) and <br /> referencing the appropriate IEBC sections. The comments provided herein presume the <br /> project will comply with the Work Area Method of Chapter 5. Based on a review of the <br /> architectural drawings, the proposed project appears to include the following work: Level <br /> 2 Alternations (Chapter 8). Additional and alternative types of work required for the project <br /> shall be identified by the designer-of-record. Additional comments may be pending. See <br /> IBC Sections 301.1 and 504.1. <br /> Work Area Method of compliance method has been added to the General Plan notes. <br /> This project falls under the IEBC Chapter 6, Repairs. The scope of the architectural <br /> elements should be deemed to fall under 602.2—New and replacement materials. A <br /> statement has been added to the General Plan notes clarifying the type and scope <br /> of the work being performed. While the concrete work falls under the definition of <br /> repair, the upper parking level membrane replacement should be classified as a <br /> Level I Alteration as defined in Chapter 7. While the upper level may be classified <br /> as the roof, the waterproofing membrane materials being installed does not <br /> necessarily constitute roofing. <br /> 2. The parking layout must be consistent with current City of Everett Standards (Drawing <br /> #340), including, but not limited to, parking aisle widths and parking stall dimensions. It <br /> appears that multiple dimensions on Detail E41A1.11 may not satisfy this standard. <br /> Additional comments from Public Works maybe pending. See IBC Section 107.2.1. <br /> 147 <br /> FCTJR_ .>F IC\! 13 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.