My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022/06/01 Council Agenda Packet
>
Council Agenda Packets
>
2022
>
2022/06/01 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2023 3:08:16 PM
Creation date
6/2/2022 11:27:15 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/1/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• There will be one (1) project kickoff meeting attended by up to two (2) Consultant Team <br />members and City staff. Kickoff meeting to be held at Everett City Hall or by teleconference. <br />• There will be three (3) design review meetings attended by up to two (2) Consultant Team <br />members and City staff, each meeting will be up to I hours long. Review meetings will be held <br />for review of: <br />o Preliminary Design <br />o 50% Design. <br />o 90% Design. <br />• Design review meetings to be held at Everett Public Works or by teleconference. <br />Deliverables <br />• Project kickoff meeting and closure meeting, with meeting minutes. <br />• Design review meetings with meeting minutes. <br />• Project schedule, update to be provided with monthly status reports. <br />• Issue Log and Risk Register to be provided at each deliverable. <br />• Bi-weeldy check -in (as necessary and determined by City Project Manager prior to each <br />meeting). <br />• Monthly status reports. <br />Task 2 — Cultural and Environmental Reviews, and Permitting <br />The Cultural and Enviromnental Reviews, and Permitting task will include the following: <br />Tasks 2.1 Local Permits <br />Consultant will review anticipated permits required for the project. The Consultant will complete the <br />SEPA checklist for the City to submit after the 90% Design. <br />City of Everett's Responsibilities <br />• City will provide review of permit documents and submittal of permits. <br />Assumptions: <br />• Local permits will be submitted by the City. <br />• A JARPA permit or Hydraulic Project Approval (HPA) will not be required for this project. <br />• Up to 30 staff hours are included for permit support. <br />Deliverables: <br />1. SEPA Permit, Draft, Final (PDF). <br />Tasks 2.2 Cultural Resource Review <br />Equinox Research and Consulting International, Inc (ERCI) will provide cultural resource management <br />services in accordance with applicable laws and regulations as defined Executive Order (EO) 21-02 or by <br />City of Everett <br />3rd Ave SE Water Quality Treatment <br />Page 2 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.