Central Paving 6/16/2022
>
Contracts
>
Capital Contract
>
Central Paving 6/16/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 2:23:46 PM
Creation date
6/17/2022 9:46:56 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Central Paving
Approval Date
6/16/2022
Council Approval Date
4/13/2022
Department
Public Works
Department Project Manager
Gael Fisk
Subject / Project Title
2022 Pavement Maintenance Overlay
Public Works WO Number
PW3764
Tracking Number
0003375
Total Compensation
$3,069,652.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Central Paving LLC 1/18/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 10/25/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Central Paving LLC 2/21/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Central Paving LLC 3/16/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
378
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 2 <br /> 3 F1-05.14.OPT1.DOCX <br /> 4 (March 13, 1995) <br /> 5 Other Contracts Or Other Work <br /> 6 <br /> 7 It is anticipated that the following work adjacent to or within the limits of this project will <br /> 8 be performed by others during the course of this project and will require coordination of <br /> 9 the work: <br /> 10 <br /> 11 "* <br /> 12 <br /> 13 • The Reservoir 2 project has a haul route over Charles Ave and the segment of <br /> 14 Federal Ave to the north of this overlay project. No direct conflict is expected <br /> 15 however, coordination may need to be considered, more information will be given at <br /> 16 the pre-construction meeting. <br /> 17 <br /> 18 *** <br /> 19 <br /> 20 1-05.16.RTF <br /> 21 Add the following new section: <br /> 22 <br /> 23 1-05.16 Water and Power <br /> 24 (October 1, 2005 APWA GSP) <br /> 25 <br /> 26 The Contractor shall make necessary arrangements, and shall bear the costs for power <br /> 27 and water necessary for the performance of the work, unless the contract includes power <br /> 28 and water as a pay item. <br /> 29 <br /> 30 1-06.GR1 <br /> 31 Control of Material <br /> 32 <br /> 33 1-06.6.RTF <br /> 34 1-06.6 Recycled Materials <br /> 35 (January 4, 2016 APWA GSP) <br /> 36 <br /> 37 Delete this section, including its subsections, and replace it with the following: I <br /> 38 <br /> 39 The Contractor shall make their best effort to utilize recycled materials in the construction <br /> 40 of the project. Approval of such material use shall be as detailed elsewhere in the <br /> 41 Standard Specifications. <br /> 42 <br /> 43 Prior to Physical Completion the Contractor shall report the quantity of recycled materials <br /> 44 that were utilized in the construction of the project for each of the items listed in Section <br /> 45 9-03.21. The report shall include hot mix asphalt, recycled concrete aggregate, recycled <br /> 46 glass, steel furnace slag and other recycled materials (e.g. utilization of on-site material <br /> 47 and aggregates from concrete returned to the supplier). The Contractor's report shall be <br /> 48 provided on DOT form 350-075 Recycled Materials Reporting. <br /> 49 <br /> I <br /> 2022 PAVEMENT MAINTENANCE OVERLAY PAGE 16 OF 85 SPECIALS <br /> WORK ORDER 3764 FEBRUARY 23,2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.