Laserfiche WebLink
1 <br /> 2 <br /> 3 F1-05.14.OPT1.DOCX <br /> 4 (March 13, 1995) <br /> 5 Other Contracts Or Other Work <br /> 6 <br /> 7 It is anticipated that the following work adjacent to or within the limits of this project will <br /> 8 be performed by others during the course of this project and will require coordination of <br /> 9 the work: <br /> 10 <br /> 11 "* <br /> 12 <br /> 13 • The Reservoir 2 project has a haul route over Charles Ave and the segment of <br /> 14 Federal Ave to the north of this overlay project. No direct conflict is expected <br /> 15 however, coordination may need to be considered, more information will be given at <br /> 16 the pre-construction meeting. <br /> 17 <br /> 18 *** <br /> 19 <br /> 20 1-05.16.RTF <br /> 21 Add the following new section: <br /> 22 <br /> 23 1-05.16 Water and Power <br /> 24 (October 1, 2005 APWA GSP) <br /> 25 <br /> 26 The Contractor shall make necessary arrangements, and shall bear the costs for power <br /> 27 and water necessary for the performance of the work, unless the contract includes power <br /> 28 and water as a pay item. <br /> 29 <br /> 30 1-06.GR1 <br /> 31 Control of Material <br /> 32 <br /> 33 1-06.6.RTF <br /> 34 1-06.6 Recycled Materials <br /> 35 (January 4, 2016 APWA GSP) <br /> 36 <br /> 37 Delete this section, including its subsections, and replace it with the following: I <br /> 38 <br /> 39 The Contractor shall make their best effort to utilize recycled materials in the construction <br /> 40 of the project. Approval of such material use shall be as detailed elsewhere in the <br /> 41 Standard Specifications. <br /> 42 <br /> 43 Prior to Physical Completion the Contractor shall report the quantity of recycled materials <br /> 44 that were utilized in the construction of the project for each of the items listed in Section <br /> 45 9-03.21. The report shall include hot mix asphalt, recycled concrete aggregate, recycled <br /> 46 glass, steel furnace slag and other recycled materials (e.g. utilization of on-site material <br /> 47 and aggregates from concrete returned to the supplier). The Contractor's report shall be <br /> 48 provided on DOT form 350-075 Recycled Materials Reporting. <br /> 49 <br /> I <br /> 2022 PAVEMENT MAINTENANCE OVERLAY PAGE 16 OF 85 SPECIALS <br /> WORK ORDER 3764 FEBRUARY 23,2022 <br />