My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Parametrix Inc. 5/31/2022
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Parametrix Inc. 5/31/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2024 1:55:45 PM
Creation date
6/17/2022 1:07:02 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Parametrix Inc.
Approval Date
5/31/2022
Council Approval Date
5/25/2022
End Date
12/31/2025
Department
Facilities
Department Project Manager
Ruben Sanchez
Subject / Project Title
EMB PW Tenant Improvements GC/CM
Tracking Number
0003381
Total Compensation
$90,759.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Parametrix Inc. 5/11/2023 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
Parametrix, Inc. 4/17/2027 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f) Parametrix will take the lead in the development of the Power Point slide--show. Data from the <br /> application will be condensed and summarized into approximately 25-35 slides which will be in <br /> an order that follows the project approval checklist. <br /> g) Parametrix will draft the presentation over 3-4 weeks and 2-3 drafts and revision cycles. When <br /> final draft is near complete, Parametrix will present to City staff then schedule an internal practice <br /> run-through of the presentation with City staff. <br /> h) Parametrix will schedule a one-hour titneslot on the day of the presentation where introductions <br /> of the PRC panel members takes place and presentation begin, <br /> hale 1 Thsk 3—GC/CM Team Procurement <br /> [. Request for Qualifications(RFQ) Step; <br /> a) The Parametrix team will work collaboratively with City staff and Procurement to develop an <br /> RFQ far the project. <br /> b) The RFQ will describe the project needs,goals, budget,schedule and the desired experience and <br /> qualifications criteria that will be utilized to score the Statements of Qualifications(SOQ) to <br /> received and shortlist 3-4 of the best qualified proposers to move forward to the Interview phase <br /> of procurement delivery process. <br /> c) Parametrix will develop the RFQ while the PRC Application is being finalized. <br /> d) As the RFQ is being finalized and readied for release the Parametrix team will provide and <br /> deliver the documents to City staff to advertise the RFQ to perspective GC/CM contractors. A <br /> draft advertisement will be shared with City(Parks&Facilities/Procurement)staff for <br /> review/comment and a final draft will be developed. <br /> 2, Review and scoring team for the procurement process: <br /> • <br /> a) Parametrix team will work in a supporting role to facilitate City staff to assemble the review and <br /> scoring team. Scoring team will consist of 5 to 7 members from City staff and the Architect <br /> involved in the construction process. Reviewing team/scoring team will be in place while the <br /> RFQ is being advertised or,at the latest,prior to receipt of the SOQs from the interested GC/CM <br /> contractors. <br /> b) The SOQs will be received by the City Procurement department and will then be distributed to <br /> the members of the review and scoring team. <br /> c) Parametrix team in conjunction with City's Procurement department will prepare a scoring <br /> criteria document and draft score sheet for use by the scoring team members during their review <br /> and will also provide a scoring team kick-off meeting to inform the members of the process,The <br /> review and scoring team review the SOQs,followed by a scoring session. <br />
The URL can be used to link to this page
Your browser does not support the video tag.