My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Osborn Consulting Inc. 6/10/2022
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Osborn Consulting Inc. 6/10/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/27/2024 2:33:38 PM
Creation date
6/23/2022 10:18:42 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Osborn Consulting Inc.
Approval Date
6/10/2022
Council Approval Date
6/1/2022
End Date
12/31/2025
Department
Public Works
Department Project Manager
Erik Emerson
Subject / Project Title
Water Quality Treatment @ 3rd Ave SE
Tracking Number
0003393
Total Compensation
$196,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
Osborn Consulting Inc. 11/25/2024 Amendment 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• There will be one(1)project kickoff meeting attended by up to two(2)Consultant Team <br /> members and City staff.Kickoff meeting to be held at Everett City Hall or by teleconference. <br /> • There will be three(3)design review meetings attended by up to two(2)Consultant Team <br /> members and City staff,each meeting will be up to 1 hours long. Review meetings will be held <br /> for review of: <br /> o Preliminary Design <br /> o 50%Design. <br /> o 90%Design. <br /> • Design review meetings to be held at Everett Public Works or by teleconference. <br /> Deliverables <br /> • Project kickoff meeting and closure meeting,with meeting minutes. <br /> • Design review meetings with meeting minutes. <br /> • Project schedule,update to be provided with monthly status reports. <br /> • Issue Log and Risk Register to be provided at each deliverable. <br /> • Bi-weeldy check-in(as necessary and determined by City Project Manager prior to each <br /> meeting). <br /> • Monthly status reports. <br /> Task 2— Cultural and Environmental Reviews, and Permitting <br /> The Cultural and Environmental Reviews, and Permitting task will include the following: <br /> Tasks 2.1 Local Permits <br /> Consultant will review anticipated permits required for the project.The Consultant will complete the <br /> SEPA checklist for the City to submit after the 90%Design. <br /> City of Everett's Responsibilities <br /> • City will provide review of permit documents and submittal of permits. <br /> Assumptions: <br /> • Local permits will be submitted by the City. <br /> • A JARPA permit or Hydraulic Project Approval(HPA)will not be required for this project. <br /> • Up to 30 staff hours are included for permit support. <br /> Deliverables: <br /> 1. SEPA Permit,Draft,Final(PDF). <br /> Tasks 2.2 Cultural Resource Review <br /> Equinox Research and Consulting International, Inc(ERCI)will provide cultural resource management <br /> services in accordance with applicable laws and regulations as defined Executive Order(EO) 21-02 or by <br /> City of Everett <br /> 3rd Ave SE Water Quality Treatment Page 2 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.