Laserfiche WebLink
Section 106 of the National Historic Preservation Act of 1966(NHPA),as amended, and specifically the <br /> regulations governing cultural resources at 36 CFR Part 800. <br /> For this Task ERCI will: <br /> • Review site forms and reports of previous archaeology on file at the Department of <br /> Archaeology and Historic Preservation(DAB?)state database WISAARD. <br /> • Review other archaeological reports and related documents on file at the ERCI offices in Mount <br /> Vernon,Washington <br /> • Review published information on the precontact,traditional Native American and historic land <br /> use in and around the project area <br /> • Prepare a report to assist with compliance to either EO 21-02 or Section 106 of the NHPA. <br /> Assumptions: <br /> • The project will not require fieldwork. <br /> • There will be no additional permits or plans. <br /> • The project will not require a cultural landscape evaluation. <br /> • There will be no Historic Property Inventory Forms for any historic buildings that will be <br /> affected by this project. <br /> Deliverables: <br /> I. Cultural Resource Report,Draft and Final(PDF). <br /> Task 3—Preliminary Design and Data Collection <br /> The Consultant will review existing data,provide site survey and geotechnical investigation to complete <br /> the preliminary water quality treatment design. <br /> Task 3.1 Survey <br /> The Consultant will coordinate and provide topographical survey of the project design area.Duane <br /> Hartman&Associates,Inc.(DHA)will provide two survey efforts to survey the existing stormwater <br /> system followed by a detailed site topographic survey for the selected facility location. <br /> The Consultant Team will provide the following services: <br /> • Provide existing as-built system survey of approximately 1,800 lineal feet of existing Storm Sewer <br /> along 3rd Avenue SE. <br /> o Obtain horizontal and vertical as-built of all storm structures,pipe sizes,materials, <br /> directions,pipe invert and rim elevations. <br /> • Perform approximately 600 lineal feet of full right of way topographic mapping for a single facility <br /> location. <br /> o All planimetric features within defined project limits will be surveyed,including <br /> underground utilities. <br /> o Including survey of utility paint-out locates <br /> City of Everett <br /> 3`d Ave SE Water Quality Treatment Page 3 of 10 <br />