11. STATEMENT OF SPECIAL INSPECTIONS <br />IBC <br />SI <br />SO <br />TITLE <br />17052 <br />✓ <br />✓ <br />STEEL CONSTRUCTION (SEE TABLES 15A,15B,15C, 15D, AND 15E) <br />1705.3 <br />✓ <br />✓ <br />CONCRETE CONSTRUCTION (SEE TABLE 13) <br />1705.6 <br />✓ <br />NR <br />SOILS (SEE TABLE 12A) <br />1705.12.1 <br />✓ <br />✓ <br />STRUCTURAL STEEL - SEISMIC FORCE RESISTING SYSTEM <br />1705.13.1 <br />SI <br />=SPECIAL INSPECTION <br />SO <br />=STRUCTURAL OBSERVATION <br />✓ <br />=ITEM IS REQUIRED <br />N/R <br />=ITEM IS NOT REQUIRED <br />SPECIAL INSPECTIONS INDICATED ARE FOR STRUCTURAL ELEMENTS ONLY. SEE ARCH; MECH AND ELEC <br />DRAWINGS FOR ADDITIONAL SPECIAL INSPECTIONS. <br />11.1 INSPECTION/TESTING REQUIREMENTS: <br />SEE DRAWINGS, SPECIFICATIONS, AND IBC SECTIONS 110, AND CHAPTER 17. <br />11,2 INSPECTIONS BY THE BUILDING OFFICIAL (IBC SECTION 110): <br />11.2.1 FOOTING AND FOUNDATION INSPECTIONS SHALL BE MADE AFTER EXCAVATIONS ARE COMPLETE <br />AND ANY REQUIRED REINFORCING IS IN PLACE. ANY REQUIRED FORMS SHALL BE IN PLACE PRIOR <br />TO INSPECTION. <br />11.2.2 CONCRETE SLAB AND UNDER FLOOR INSPECTIONS SHALL BE MADE AFTER ALL IN SLAB OR UNDER <br />FLOOR REINFORCING, CONDUIT, PIPING AND OTHER ANCILLARY EQUIPMENT ITEMS AND <br />ACCESSORIES ARE IN PLACE BUT PRIOR TO CONCRETE PLACEMENT OR FLOOR SHEATHING <br />INSTALLATION. <br />11.2.3 FRAMING INSPECTIONS SHALL BE MADE AFTER ALL SHEATHING, FRAMING, BLOCKING AND BRACING <br />ARE COMPLETE AND ALL PIPES, DUCTS, ELECTRICAL, PLUMBING, ETC., ARE INSTALLED AND <br />APPROVED PRIOR TO COVER. <br />11.2.4 IN ADDITION TO THE INSPECTIONS SPECIFIED ABOVE, THE BUILDING OFFICIAL IS AUTHORIZED TO <br />MAKE OR REQUIRE OTHER INSPECTIONS OF ANY CONSTRUCTION WORK TO ASCERTAIN <br />COMPLIANCE WITH THE PROVISIONS OF THE IBC OR OTHER LAWS ENFORCED BY THE BUILDING <br />OFFICIAL. <br />113 STRUCTURAL TESTS AND SPECIAL INSPECTIONS (IBC CHAPTER 17): <br />1IL11 SEE PROJECT SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS. <br />11.3.2 STRUCTURAL TESTS AND SPECIAL INSPECTIONS SHALL BE PERFORMED IN ACCORDANCE WITH THE <br />REQUIREMENTS OF CHAPTER 17 OF THE IBC AS WELL AS ANY ADDITIONAL REQUIREMENTS OF THE <br />BUILDING OFFICIAL. OMISSION FROM THE LIST BELOW OF TESTING AND INSPECTION <br />REQUIREMENTS SHALL NOT RELIEVE THE CONTRACTOR FROM PROVIDING TESTING AND <br />INSPECTION REQUIRED BY THE SPECIFICATIONS, THE IBC AND THE BUILDING OFFICIAL, <br />11.3.3 TESTING AND SPECIAL INSPECTIONS SHALL BE COMPLETED IN ACCORDANCE WITH THE <br />REQUIREMENTS OF CHAPTER 17 OF THE IBC FOR THE ITEMS LISTED IN THIS SECTION. <br />11.4 STRUCTURAL OBSERVATION <br />11.4.1 STRUCTURAL OBSERVATION SHALL BE PERFORMED DURING CONSTRUCTION IN A MANNER AS <br />REQUIRED TO BECOME GENERALLY FAMILIAR WITH THE IN PLACE CONSTRUCTION. <br />11.4.2 STRUCTURAL OBSERVATION EXTENT SHALL BE AS INDICATED ABOVE. TIMING AND DURATION OF <br />OBSERVATIONS SHALL BE COORDINATED WITH THE GENERAL CONTRACTOR DURING <br />CONSTRUCTION. <br />11.4.3 CONSTRUCTION OBSERVATION REPORTS AND FINDINGS SHALL NOT BE VIEWED AS A WARRANTY OR <br />GUARANTEE BY THE STRUCTURAL ENGINEER. <br />11.5 SPECIAL INSPECTOR: SHALL BE CURRENTLY WABO CERTIFIED. <br />11.5.1 THE SPECIAL INSPECTOR SHALL OBSERVE THE WORK ASSIGNED FOR CONFORMANCE WITH THE <br />APPROVED DESIGN DRAWINGS AND SPECIFICATIONS. <br />11.5.2 THE SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS TO THE BUILDING OFFICIAL, <br />ENGINEER OF RECORD, ARCHITECT OF RECORD, AND OTHER DESIGNATED PERSONS. ALL <br />DISCREPANCIES SHALL BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE GENERAL <br />CONTRACTOR FOR CORRECTION, THEN, IF NOT IN CONFORMANCE, TO THE PROPER DESIGN <br />AUTHORITY AND BUILDING OFFICIAL. <br />11.5.3 THE SPECIAL INSPECTOR SHALL SUBMIT A FINAL REPORT STATING WHETHER THE WORK REQUIRING <br />SPECIAL INSPECTION WAS IN CONFORMANCE WITH THE APPROVED PLANS AND SPECIFICATIONS <br />AND THE APPLICABLE WORKMANSHIP PROVISIONS OF THE IBC. <br />12.1 SPECIAL INSPECTIONS AND TESTS FOR EXISTING SITE SOIL CONDITIONS, FILL PLACEMENT, AND LOAD -BEARING REQUIREMENTS PER <br />IBC 1705.6., AS NOTED IN TABLE 12A. <br />12.1.1 THE APPROVED GEOTECHNICAL REPORT AND THE CONSTRUCTION DOCUMENTS PREPARED BY THE REGISTERED DESIGN <br />PROFESSIONALS SHALL BE USED TO DETERMINE COMPLIANCE. <br />Ell <br />IBC TABLE 1705.3 <br />CONTINUOUS <br />PERIODIC <br />REFERENCED <br />SPECIAL INSPECTION OR TEST TYPE <br />SPECIAL <br />SPECIAL <br />STANDARD <br />IBC REFERENCE <br />INSPECTION <br />INSPECTION <br />1. INSPECT REINFORCEMENT, INCLUDING PRESTRESSING <br />ACI 318: CH. 20, <br />TENDONS, AND VERIFY PLACEMENT <br />N/R <br />✓ <br />25.2, 25.3, <br />1908A <br />26.6.1-26.6.3 <br />2. REINFORCING BAR WELDING: <br />A. VERIFY WELDABILITY OF REINFORCING BARS <br />NIR <br />✓ <br />AWS DIA <br />OTHER THAN ASTM A706 <br />ACI 318: 26.6.4 <br />B. INSPECT SINGLE -PASS FILLET WELDS, MAXIMUM <br />AWS D1.4 <br />%d"; AND <br />NfR <br />✓ <br />ACI 318: 26.6.4 <br />C. INSPECT ALL OTHER WELDS <br />✓ <br />N/R <br />A4NS D1.4 <br />ACI 318:26.6.4 <br />3. INSPECT ANCHORS CAST IN CONCRETE <br />N/R <br />✓ <br />ACI 318` 17.8.2 <br />4. INSPECT ANCHORS POST -INSTALLED IN HARDENED <br />CONCRETE MEMBERS: <br />A. ADHESIVE ANCHORS INSTALLED IN <br />HORIZONTALLY OR UPWARDLY INCLINED <br />✓ <br />N/R <br />ACI 318: 17.8.2.4 <br />ORIENTATIONS TO RESIST SUSTAINED TENSION <br />LOADS <br />B. MECHANICAL ANCHORS AND ADHESIVE ANCHORS <br />N/R <br />✓ <br />ACI 318: 17.8.2 <br />NOT DEFINED IN 4A <br />AC1318: <br />1904.1, 1904,2, <br />5. VERIFY USE OF REQUIRED DESIGN MIX <br />N/R <br />✓ <br />CH. 19, 26,4.3, <br />1908.2, 1908.3 <br />26.4.4 <br />6. PRIOR TO CONCRETE PLACEMENT, FABRICATE SPECIMENS <br />ASTM C *172 <br />FOR STRENGTH TESTS, PERFORM SLUMP AND AIR CONTENT <br />✓ <br />N/R <br />ASTM C 31 <br />1908.10 <br />TESTS, AND DETERMINE THE TEMPERATURE OF THE <br />ACI 318: 26.4, <br />CONCRETE <br />26.12 <br />7. INSPECT CONCRETE AND SHOTCRETE PLACEMENT FOR <br />✓ <br />NIR <br />ACI 318:26.5 <br />1908.6, 1908.7, <br />PROPER APPLICATION TECHNIQUES <br />1908.8 <br />8. VERIFY MAINTENANCE OF SPECIFIED CURING <br />N/R <br />✓ <br />ACI 318: <br />1908.9 <br />TEMPERATURE AND TECHNIQUES <br />26.5.3-26.5.5 <br />9. INSPECT PRESTRESSED CONCRETE FOR: <br />A. APPLICATION OF PRESTRESSING FORCES <br />✓ <br />I <br />ACI 318: 26.10 <br />B. GROUTING OF BONDED PRESTRESSING TENDONS <br />✓ <br />N/R <br />ACI 318: 26.10 <br />10. INSPECT ERECTION OF PRECAST CONCRETE MEMBERS <br />NIR <br />✓ <br />ACI 318: 26.8 <br />11. VERIFY IN -SITU CONCRETE STRENGTH, PRIOR TO <br />STRESSING OF TENDONS IN POST -TENSIONED CONCRETE <br />N/R <br />✓ <br />ACI 318: 26.11.2 <br />AND PRIOR TO REMOVAL OF SHORES AND FORMS FROM <br />BEAMS AND STRUCTURAL SLABS <br />12, INSPECT FORMWORK FOR SHAPE, LOCATION AND <br />NIR <br />✓ <br />ACI 318: <br />DIMENSIONS OF THE CONCRETE MEMBER BEING FORMED <br />26.11,1.2(b) <br />13.1 CONCRETE: SPECIAL INSPECTION AND TESTING PER IBC TABLE 17053 AS NOTED IN TABLE 13, INCLUDING: <br />13.1.2 CONTINUOUS SPECIAL INSPECTION OF CONCRETE PLACEMENT FOR PROPER APPLICATION TECHNIQUES <br />13,1.3 CONTINUOUS SPECIAL INSPECTION OF BOLTS INSTALLED IN CONCRETE PRIOR TO AND DURING PLACEMENT OF CONCRETE. <br />13.1.6 SPECIFIC REQUIREMENTS FOR SPECIAL INSPECTION OF ANCHORS INSTALLED IN HARDENED CONCRETE SHALL BE AS <br />DESCRIBED IN THE RESEARCH REPORT ISSUED BY AN APPROVED SOURCE (ICC, IAPMO, ETC.). <br />13.2 ADDITIONAL REQUIRED SPECIAL INSPECTIONS FOR SEISMIC RESISTANCE PER IBC SECTION 1705.12. <br />1 A. REQUIRED SPECIAL INSPECTIONS AND TESTS OF STRUCTURAL STEEL <br />CONSTRUCTION INSPECTION OF WELDING <br />CONTINUOUS <br />PERIODIC REFERENCED <br />SPECIAL INSPECTION OR TEST TYPE <br />SPECIAL <br />SPECIAL STANDARD <br />INSPECTION <br />INSPECTION <br />AISC 360 TABLE N5.4-1 <br />1. PRIOR TO WELDING, VERIFY AND INSPECT THE FOLLOWING: <br />A. WELDING PROCEDURE SPECIFICATIONS (WPS) <br />✓ <br />N/R - <br />B. MANUFACTURER CERTIFICATIONS FOR WELDING CONSUMABLES <br />✓ <br />N/R AISC 360 A3.5 <br />C. MATERIAL IDENTIFICATION OF STRUCTURAL STEEL MEMBERS <br />N/R <br />✓ AISC 360 All <br />D. WELDER IDENTIFICATION SYSTEM <br />N/R <br />✓ <br />E. FIT -UP OF GROOVE WELDS, INCLUDING JOINT GEOMETRY <br />1) JOINT PREPARATION <br />2) DIMENSIONS: ALIGNMENT, ROOT OPENING, ROOT FACE, BEVEL <br />N/R <br />✓ <br />3) CLEANLINESS: CONDITION OF STEEL SURFACES <br />4) TACKING: TACK WELD QUALITY AND LOCATION <br />5) BACKING TYPE AND FIT (IF APPLICABLE) <br />F. CONFIGURATION AND FINISH OF ACCESS HOLES <br />N/R <br />✓ <br />G. FIT -UP OF FILLET WELDS <br />1) DIMENSIONS: ALIGNMENT, GAPS AT ROOT <br />N/R <br />✓ <br />2) CLEANLINESS: CONDITION OF STEEL SURFACES <br />3) TACKING: TACK WELD QUALITY AND LOCATION <br />H, CHECK WELDING EQUIPMENT <br />N/R <br />✓ - <br />AISC 360 TABLE N5.4-2 <br />2. DURING WELDING, VERIFY AND INSPECT THE FOLLOWING: <br />A. USE OF QUALIFIED WELDERS <br />N/R <br />✓ - <br />B. CONTROL AND HANDLING OF WELDING CONSUMABLES <br />1) PACKAGING <br />N/R <br />✓ <br />2) EXPOSURE CONTROL <br />C. NO WELDING OVER CRACKED TACK WELDS <br />N/R <br />✓ <br />D. ENVIRONMENTAL CONDITIONS <br />1) WIND SPEED WITHIN LIMITS <br />NIR <br />✓ <br />2) PRECIPITATION AND TEMPERATURE <br />E WELDING PROCEDURE SPECIFICATIONS FOLLOWED <br />1) SETTINGS ON WELDING EQUIPMENT <br />2) TRAVEL SPEED <br />3) SELECTED WELDED MATERIALS <br />- - <br />NIR <br />✓ <br />4) SHIELDING GAS TYPE AND FLOW RATE <br />5) PREHEAT APPLIED <br />6) INTERPASS TEMPERATURE MAINTAINED <br />7) PROPER POSITION <br />F. WELDING TECHNIQUES <br />1) INTERPASS AND FINAL CLEANING <br />N/R <br />✓ <br />2) EACH PASS WITHIN PROFILE LIMITATIONS <br />3) EACH PASS MEETS QUALITY REQUIREMENTS <br />AISC 360 TABLE N5.4.3 <br />3. AFTER WELDING, VERIFY AND INSPECT THE FOLLOWING: <br />A, WELDS CLEANED <br />NIR <br />✓ <br />B. SIZE, LENGTH, AND LOCATION OF WELDS <br />✓ <br />N/R <br />C. WELDS MEET VISUAL ACCEPTANCE CRITERIA <br />1) CRACK PROHIBITION <br />2) WELD TO BASE METAL FUSION <br />3) CRATER CROSS SECTION <br />✓ <br />NIR - <br />4) WELD PROFILES <br />5) WELD SIZE <br />6)UNDERCUT <br />7) POROSITY <br />D. ARC STRIKES <br />✓ <br />N/R <br />E. k-AREA <br />✓ <br />N/R <br />F. BACKING REMOVED AND WELD TABS REMOVED, IF REQUIRED <br />✓ <br />N/R <br />G. REPAIR ACTIVITIES <br />✓ <br />N/R <br />H. DOCUMENT ACCEPTANCE OR REJECTION OF WELDED JOINT OR <br />✓ <br />N/R <br />MEMBER <br />T STRUCTURAL <br />1a REQUIRED SPECIAL INSPECTIONS TESF f <br />STEEL- <br />m60 <br />duo <br />ONST UCTION INSPECTION F BOLTING <br />' CO a- <br />N 5 <br />- <br />SPECIAL INSPECTION OR TEST TYPE <br />CONTINUOUS <br />SPECIAL <br />PERIODIC <br />SPECIAL REFERENCED <br />,M 0 <br />®n, u <br />? a <br />INSPECTION <br />INSPECTION STANDARD <br />2 <br />LO <br />w <br />N®0 0'��S <br />Z <br />AISC 360 TABLE N.5.6-1 <br />-- <br />Do <br />r <br />1. PRIOR TO BOLTING, VERIFY AND INSPECT THE FOLLOWING: <br />N <br />A. MANUFACTURER'S CERTIFICATIONS FOR FASTENER MATERIALS <br />✓ <br />N/R <br />r <br />B. FASTENERS MARKED IN ACCORDANCE WITH ASTM REQUIREMENTS <br />N/R <br />✓ <br />C. PROPER FASTENER SELECTED FOR JOINT DETAIL <br />N/R <br />✓ AISC 360 All <br />D. PROPER BOLTING PROCEDURE SELECTED FOR JOINT DETAIL <br />N/R <br />✓ <br />E. CONNECTING ELEMENTS, INCLUDING THE APPROPRIATE FAYING <br />SURFACE CONDITIONS AND HOLE PREPARATION, IF SPECIFIED, MEET <br />N/R <br />✓ <br />APPLICABLE REQUIREMENTS <br />F. PRE -INSTALLATION VERIFICATION TESTING BY INSTALLATION <br />PERSONNEL OBSERVED AND DOCUMENTED FOR FASTENER ASSEMBLIES <br />✓ <br />N/R <br />AND METHODS USED <br />3 <br />G. PROPER STORAGE PROVIDED FOR BOLTS, NUTS, WASHERS, AND4 <br />N/R <br />✓ _ <br />OTHER FASTENER COMPONENTS <br />AISC 360 TABLE N5.6-2 <br />_j <br />2, DURING BOLTING, VERIFY AND INSPECT THE FOLLOWING: <br />A. FASTENER ASSEMBLIES, OF SUITABLE CONDITION, PLACED IN ALL <br />N/R <br />HOLES AND WASHERS (IF REQUIRED) ARE POSITIONED AS REQUIRED <br />B. JOINT BROUGHT TO THE SNUG -TIGHT CONDITION PRIOR TO THE <br />N/R <br />✓ <br />PRETENSIONING OPERATION <br />C. FASTENER COMPONENT NOT TURNED BY THE WRENCH PREVENTEDCo <br />N/R <br />✓ <br />FROM ROTATING <br />D. FASTENERS ARE PRETENSIONED IN ACCORDANCE WITH THE RCSC <br />SPECIFICATION, PROGRESSING SYSTEMATICALLY FROM THE MOST RIGID <br />N/R <br />✓€ <br />70 <br />POINT TOWARD THE FREE EDGES <br />AISC 360 TABLE N5.6-3 <br />F <br />rD <br />CD <br />00 <br />3. AFTER BOLTING, VERIFY AND INSPECT THE FOLLOWING: <br />L::A::,DOCUMENT�ACCEPT�ANCE�REJEC�TION F BOLTE�CONN�ECTIONS <br />✓ <br />N/R - <br />® <br />E y <br />bi <br />MOTES CONTINUE ON SKEET <br />S0a04 <br />w <br />x <br />0 <br />U <br />tI <br />N O <br />N 4 <br />Ali <br />o >¢� , <br />az�Qoo <br />� <br />3w ,� g <br />o <br />t2 <br />(sl <br />U >®vF,o <br />pow <br />�z�oo <br />} <br />aaao <br />s <br />= <br />sm <br />CD <br />d <br />ai <br />rl <br />o rl <br />*� <br />aLL <br />� "' rq <br />C:) <br />� <br />v <br />cn <br />kk <br />v <br />V <br />- <br />I: <br />' rr <br />TACOMA SEATITLE SPOKANE TRI•CITIES <br />2215 North 30th Street, Suite 300 Tacoma, WA 98403 <br />253.383.2422 TEL 253,383,2572 FAX wNw,ahbl.com WEB <br />LU <br />v <br />ca <br />0 <br />CL <br />6i <br />< <br />i <br />Lo <br />0 <br />v <br />0 <br />