My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Specialized Pavement Marking 7/5/2022
>
Contracts
>
Small Works
>
Specialized Pavement Marking 7/5/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2022 10:22:38 AM
Creation date
7/14/2022 11:50:02 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Specialized Pavement Marking
Approval Date
7/5/2022
Department
Public Works
Department Project Manager
Jenny Chang/Corey Hert
Subject / Project Title
2022 Pavement Markings
Public Works WO Number
2022-037
Tracking Number
0003420
Total Compensation
$361,851.15
Contract Type
Small Works
Retention Period
6 Years Then Destroy
Document Relationships
Specialized Pavement Marking 10/10/2022 Amendment 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Small Works
Specialized Pavement Marking 8/1/2022 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Small Works
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
27035 <br /> WASHINGTON EVERETT <br /> CITY OF EVERETT, WASHINGTON <br /> CONTRACT <br /> THIS CONTRACT is made and entered into this 5 day of,)t,( 1(3 , 20 by and between the <br /> City of Everett, a Washington municipal corporation (the "City"), and spcialized Pavement Marking (the <br /> "Contractor"). <br /> In consideration of the sums to be paid to it by the City, the Contractor hereby covenants and agrees to <br /> furnish all labor, tools, materials, equipment, and supplies required to build and construct in <br /> accordance with the Contract Documents the work, improvements, and appurtenances set forth in the <br /> Invitation to Quote entitled: <br /> 2022 Citywide Pavement Markings <br /> The entire work, improvements, and appurtenances set forth in such Invitation to Quote is referred to <br /> herein as either the "Work" or the "Project." <br /> 1. Contract Documents. The following documents ("Contract Documents") are <br /> incorporated by reference and are hereby made a part of this Contract: <br /> A. Invitation for Quote and addenda thereto, including without limitation <br /> Instructions, General Conditions, Specifications, Contractor Commitment and Information, Price Sheet, <br /> Certification of Compliance, MWDBE Certification, Contractor References, and any other document <br /> included in the Invitation to Quote. <br /> B. Change Orders (if any) <br /> C. All provisions required by law. <br /> A purchase order issued as a Notice to Proceed is only a Contract Document as a Notice to Proceed. <br /> Such purchase order's pre-printed terms and conditions are not part of the Contract. <br /> If there is any inconsistency in the parts of the Contract Documents, then the most stringent on the <br /> Contractor applies, unless the City's authorized representative determines otherwise in writing. The <br /> Work required in one part must be furnished even if not mentioned in other parts of the Contract. <br /> These parts complement each other in describing the complete Work. Any requirement in one part <br /> binds as if stated in all parts. The Contractor shall provide any work or materials clearly implied in the <br /> Contract even if the Contract does not mention it specifically. <br /> 2. Contract Time. The Work shall be physically complete in all respects seventy-five (75) <br /> calendar days from the date of issuance of the Notice to Proceed. <br /> 3. Liquidated Damages. The parties agree the City will suffer damage and be put to <br /> additional expense in the event that the Contractor does not complete the Work in all respects and <br />
The URL can be used to link to this page
Your browser does not support the video tag.