My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brink Electrical Inc. 7/19/2022
>
Contracts
>
Capital Contract
>
Brink Electrical Inc. 7/19/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 2:29:32 PM
Creation date
7/21/2022 11:58:20 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brink Electrical Inc.
Approval Date
7/19/2022
Council Approval Date
5/25/2022
Department
Transportation Services
Department Project Manager
Vincent Bruscas
Subject / Project Title
Inductive Charging Infrastructure for Transit
Tracking Number
0003429
Total Compensation
$498,000.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Brink Electric, LLC 11/6/2023 Change Order 4
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Brink Electrical Inc. 2/9/2023 Change Order 3
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
380
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ICity of Everett 00 7200 - <br /> Inductive Charging Infrastructure for Everett Transit <br /> I <br /> SECTION 007200 <br /> ' GENERAL CONDITIONS <br /> CONTENTS <br /> 1. GENERAL INFORMATION 1 <br /> I1.1 Definitions of Words and Terms 1 <br /> 1.2. Contract Documents 5 <br /> I <br /> 2. SPECIFICATIONS AND DRAWINGS 6 <br /> 2.1. Interpretation of Specifications and Drawings 6 <br /> 2.2. Division of Specifications and Drawings 6 <br /> I <br /> 2.3. Discrepancies in Specifications and Drawings 6 <br /> 2.3.1. Errors and Omissions 6 <br /> 2.3.2. Conflicting Provisions 7 <br /> I <br /> 2.3.3. Utilities 7 <br /> 2.3.3.1 General 7 <br /> I <br /> 2.3.3.2 Known Utilities 8 <br /> 2.3.3.3 Service Connections 8 <br /> 2.3.3.4 Unknown Utilities 8 <br /> I <br /> 2.4. Submittals 8 <br /> 2.5. Contractor's Copies of Contract Documents 8 <br /> 3. OWNER 9 <br /> I <br /> 3.1. General 9 <br /> 3.2. Owner's Representative 9 <br /> I <br /> 4. CONTRACTOR 10 <br /> 4.1. Contractor's Representative 10 <br /> 4.2. Construction Procedures 11 <br /> I <br /> 4.3. Subcontractors 11 <br /> 4.4. Responsibilities 12 <br /> 4.4.1. Subcontractors,Manufacturers and Suppliers 12 <br /> ' 4.4.2. Contractor's Employees 12 <br /> 4.4.3. Payment for Labor and Materials 12 <br /> 4.4.4. Attention to Work 13 <br /> I <br /> 4.4.5. Safety 13 <br /> 4.4.6. Threats,Intimidation and Harassment Forbidden 13 <br /> 4.4.7. Weapons Forbidden 13 <br /> I4.4.8. Safety Standards 13 <br /> 4.4.9. Public Safety and Convenience 13 <br /> 4.4.10. Access to Work 14 <br /> I4.4.11. Emergencies 14 <br /> 4.4.12. Trench Excavation 14 <br /> I <br /> 4.5. Owner-Contractor Coordination 14 <br /> 4.5.1. Service of Notice 14 <br /> 4.5.2. Suggestions to Contractor 15 <br /> I00 7200 - GENERAL CONDITIONS <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.