Laserfiche WebLink
RFQ No. 2021-134 <br /> Everett Transit Inductive Charging Infrastructure Field Installation <br /> Exhibit A— Scope of Services <br /> Deliverables: <br /> • Construction bid documents <br /> • Construction and installation scope of work <br /> • Drawings, schematics, etc. necessary for construction <br /> TASK 3-CONSTRUCTION MANAGEMENT: <br /> • Participate in construction contractor selection process: <br /> • Attend up to six(6) meetings as requested and required as part of process. <br /> • Six (6)onsite visits during construction management. <br /> • Change order management <br /> • Project closeout and document transfer <br />