My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services LLC of Seattle 7/21/2022
>
Contracts
>
Capital Contract
>
Always Active Services LLC of Seattle 7/21/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2022 9:44:31 AM
Creation date
7/29/2022 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services LLC of Seattle
Approval Date
7/21/2022
Council Approval Date
6/15/2022
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
Interurban Trail to YMCA Pedestrian Impvts
Public Works WO Number
UP3749
Tracking Number
0003441
Total Compensation
$332,142.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 1 3. After*** 2:30pm *** on the day prior to a holiday or holiday weekend, and <br /> I 2 <br /> 3 4. Before *** 7:00am *** on the day after the holiday or holiday weekend. <br /> 4 <br /> I <br /> 5 1-07.24.RTF <br /> 6 1-07.24 Rights of Way <br /> 7 (July 23, 2015 APWA GSP) <br /> 8 <br /> I <br /> 9 Delete this section and replace it with the following: <br /> 10 <br /> 11 Street Right of Way lines, limits of easements, and limits of construction permits are <br /> I <br /> 12 indicated in the Plans. The Contractor's construction activities shall be confined within <br /> 13 these limits, unless arrangements for use of private property are made. <br /> 14 <br /> I 15 Generally, the Contracting Agency will have obtained, prior to bid opening, all rights of <br /> 16 way and easements, both permanent and temporary, necessary for carrying out the <br /> 17 work. Exceptions to this are noted in the Bid Documents or will be brought to the <br /> I <br /> 18 19 Contractor's attention by a duly issued Addendum. <br /> 20 Whenever any of the work is accomplished on or through property other than public <br /> I <br /> 21 Right of Way, the Contractor shall meet and fulfill all covenants and stipulations of any <br /> 22 easement agreement obtained by the Contracting Agency from the owner of the private <br /> 23 property. Copies of the easement agreements may be included in the Contract <br /> 24 Provisions or made available to the Contractor as soon as practical after they have been <br /> I 25 obtained by the Engineer. <br /> 26 <br /> 27 Whenever easements or rights of entry have not been acquired prior to advertising, <br /> I <br /> 28 29 these areas are so noted in the Plans. The Contractor shall not proceed with any portion <br /> of the work in areas where right of way, easements or rights of entry have not been <br /> 30 acquired until the Engineer certifies to the Contractor that the right of way or easement is <br /> I 31 available or that the right of entry has been received. If the Contractor is delayed due to <br /> 32 acts of omission on the part of the Contracting Agency in obtaining easements, rights of <br /> 33 entry or right of way, the Contractor will be entitled to an extension of time. The <br /> I34 Contractor agrees that such delay shall not be a breach of contract. <br /> 35 <br /> 36 Each property owner shall be given 48 hours notice prior to entry by the Contractor. This <br /> 37 includes entry onto easements and private property where private improvements must <br /> I <br /> 38 39 be adjusted. <br /> 40 The Contractor shall be responsible for providing, without expense or liability to the <br /> I <br /> 41 42 Contracting Agency, any additional land and access thereto that the Contractor may <br /> desire for temporary construction facilities, storage of materials, or other Contractor <br /> 43 needs. However, before using any private property, whether adjoining the work or not, <br /> I <br /> 44 45 the Contractor shall file with the Engineer a written permission of the private property <br /> owner, and, upon vacating the premises, a written release from the property owner of <br /> 46 each property disturbed or otherwise interfered with by reasons of construction pursued <br /> 47 under this contract. The statement shall be signed by the private property owner, or <br /> I 48 proper authority acting for the owner of the private property affected, stating that <br /> 49 permission has been granted to use the property and all necessary permits have been <br /> 50 obtained or, in the case of a release, that the restoration of the property has been <br /> INTERURBAN TRAIL TO YMCA PEDESTRIAN IMPROVEMENTS SPECIAL PROVISIONS <br /> WORK ORDER 3749 Page SP31 of SP68 MAY 2,2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.