Laserfiche WebLink
I <br /> 1 Earthwork quantities will be computed, either manually or by means of electronic data <br /> 2 3 processing equipment, by use of the average end area method. <br /> 4 Cross-section notes for Beaumont Drive and Alta Drive are made available for reference <br /> 5 6 and are located in the Appendix. <br /> 7 Roadway excavation including haul will be measured by the cubic yard. Roadway <br /> 8 excavation will be measured in its original position by cross-sectioning. There will be no <br /> 9 adjustment in measurement for embankment for subsidence. Verification of existing <br /> 10 utilities depths by potholing prior to excavation will be paid under Roadway Excavation <br /> 11 Incl. Haul. <br /> 12 <br /> 13 *** <br /> 14 <br /> 15 END DIVISION2.RTF <br /> 16 END DIVISION 2 <br /> 17 <br /> I <br /> I <br /> 1 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> 1 <br /> INTERURBAN TRAIL TO YMCA PEDESTRIAN IMPROVEMENTS SPECIAL PROVISIONS <br /> WORK ORDER 3749 Page SP43 of SP68 MAY 2,2022 <br /> I <br />