My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Always Active Services LLC of Seattle 7/21/2022
>
Contracts
>
Capital Contract
>
Always Active Services LLC of Seattle 7/21/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2022 9:44:31 AM
Creation date
7/29/2022 9:35:53 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Always Active Services LLC of Seattle
Approval Date
7/21/2022
Council Approval Date
6/15/2022
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
Interurban Trail to YMCA Pedestrian Impvts
Public Works WO Number
UP3749
Tracking Number
0003441
Total Compensation
$332,142.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> 1 <br /> 2 <br /> 3 DIV/SION4.GR4 <br /> 4 Division 4 <br /> 5 Bases <br /> 6 <br /> 7 GSL 4-04.1 CSBC.docx <br /> 8 Section 4-04.1 is supplemented with the following: <br /> 9 <br /> 10 4-04.1 Description <br /> 11 <br /> 12 (******) <br /> 13 <br /> 14 Where shown in the Plans, or as directed by the Engineer, the Contractor shall place, <br /> 15 smooth, and compact "Crushed Surfacing Base Course". <br /> 16 <br /> 17 Crushed surfacing can also be used as driveway maintenance, and in gravel driveway I <br /> 18 restoration to a minimum of 3" depth. <br /> 19 <br /> 20 All materials, labor, tools, and equipment required to furnish, haul, stockpile, place, and <br /> 21 compact the crushed surfacing to its final grade shall be included in the contract unit price. II <br /> 22 <br /> 23 END DIVISION4.RTF <br /> 24 END DIVISION 4 <br /> 25 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> 1 <br /> INTERURBAN TRAIL TO YMCA PEDESTRIAN IMPROVEMENTS SPECIAL PROVISIONS <br /> WORK ORDER 3749 Page SP44 of SP68 MAY 2,2022 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.