Laserfiche WebLink
I <br /> 1 B) Service Connections: The Contractor shall obtain a City of Everett <br /> 2 Electrical Permit from the Contracting Agency at no cost. Coordinate I <br /> 3 with the Engineer a minimum of 30 days prior to connection for all <br /> 4 Electrical Permits. When the service is ready to be hooked up, the <br /> 5 Contractor shall contact the Engineer to request an electrical <br /> 6 inspection. After the service has been approved for hook up, the City <br /> 7 shall contact the Snohomish County PUD and they will make the <br /> 8 service connections to the power supply at a cost to be paid by the <br /> 9 City. The Contractor shall notify the PUD of the work schedule as <br /> 10 soon as possible so their work can be coordinated with the <br /> 11 Contractor's work. <br /> 12 1 13 CNH 8-20.3(13)C(9-29.10) LUMINAIRES.RTF <br /> 14 8-20.3(13) Illumination Systems <br /> 15 <br /> 111 <br /> 16 Luminaires <br /> 17 Section 8-20.3(13)C is supplemented with the following: <br /> 18 I 19 Unless otherwise noted, luminaires in the project will be furnished and installed by the <br /> 20 Contractor. <br /> 21 <br /> 22 Street Luminaires (LED) <br /> 23 <br /> 24 Street Luminaires shall be an integral unit with the specified optical performance, and <br /> 25 mechanical features that facilitate installation and maintenance. The fixture shall have a full <br /> 26 size terminal block and quick electrical disconnects to assure easy installation, leveling, and <br /> 27 maintenance access. A flush house-side shield plate shall be factory supplied and installed if <br /> 28 required by the plans. <br /> 29 <br /> 30 The housing shall be cast aluminum with a universal 4 bolt slipfitter for a two inch nominal <br /> 31 mounting tenon. The unit shall have cooling fins to make for a long-life, efficient LED unit. <br /> 32 Electrical components shall be accessible without tools and mounted on or behind a <br /> 33 removable power door. The power door shall feature quick electrical disconnects to the <br /> 34 terminal board and LED board. The luminaire shall be provided with a ANSI seven pin (PCR7) <br /> 35 photocell receptacle. <br /> 36 <br /> 37 Each luminaire shall be provided with a long life photocell compatible with the seven pin <br /> 38 (PCR7) receptacle. The following photocells are pre-approved for use: <br /> 39 <br /> 40 Ripley Lighting Controls Long Life II 6390LL-BK-2.8 <br /> 41 Sun-Tech TRS-2-8190 <br /> 42 Dark to Light DLL Elite 127-2.8 IR <br /> 43 <br /> 44 The LED nominal correlated color temperature shall be 4000°K +/- 200°K with a CRI >_ 70. <br /> 45 The light emitting diodes shall be high flux, high power white LED producing a minimum of <br /> 46 90% of initial intensity at 70,000 hours of life. The LEDs shall provide a copy of their test <br /> 47 documentation to the Engineer for the IES LM-80 testing procedure. The LEDs shall be <br /> 48 mercury and lead free. Nominal lumen efficacy shall exceed 108 lumens/W. <br /> 49 <br /> INTERURBAN TRAIL TO YMCA PEDESTRIAN IMPROVEMENTS SPECIAL PROVISIONS <br /> WORK ORDER 3749 Page SP60 of SP68 MAY 2,2022 <br /> I <br />