Laserfiche WebLink
Supplement No. 1 Scope of Work <br />Edgewater Bridge Replacement <br />INTRODUCTION <br />Under the Edgewater Bridge Replacement project, the City of Everett (City) has requested that <br />TranTech Engineering, LLC's team (Consultant) prepare a supplement to provide professional <br />services to perform work not included within the original Scope of Services and Construction <br />Phase Engineering and Construction Management Services. <br />Additional design phase services provided by one of the TranTech team's members, Perteet, <br />under Work Elements 1, 4 & 11 consist of additional project management, additional detention <br />pipe design and coordination, additional pre -ad ready design and coordination, preparation of <br />pre -ad ready plans, estimate, and specifications for two additional submittals, additional plan, <br />estimate, and specifications revisions based on comments as requested by the City of Everett <br />(City), and additional environmental permitting support and assistance as requested by the City. <br />This Supplement Scope of Services also includes professional services to provide construction <br />phase engineering design support and construction management services by the Consultant. The <br />estimated number of working days for the construction phase is 336 working days. <br />In the following the additional scope of work is described in further detail. <br />In the following the additional scope of work is described in further detail. <br />Work Element 1 —Project Management (Supplemented) <br />Work Element 4 —Environmental Permitting (Supplemented) <br />Work Element 11 —Civil, Roadway & Drainage Design (Supplemented) <br />The extra services are identified in the detailed Scope of Services below. <br />SCOPE OF SERVICES DEFINED <br />Page I 1 <br />City of Everett — Edgewater Bridge Replacement <br />