Laserfiche WebLink
Task 1 Project Management (Supplemented) <br />This task includes project administration, meeting coordination, and design team management. <br />Work Elements: <br />• Consultant Team Meetings — approximately nine (9) additional team meetings are <br />assumed for the additional design services. <br />• Monthly Progress Reports and Invoicing — approximately eighteen (18) progress reports <br />containing a narrative that identifies and describes significant activities performed in the <br />previous month. <br />• Design Team Management — below is a list of continued tasks to be provided for the <br />duration of the additional design: <br />• Schedule and coordinate with design team. <br />• Monitor project budget. <br />• Maintain regular informal contact telephone discussions and electronic mail. <br />Deliverables: <br />• Invoices and Progress Reports <br />Task 4 — Environmental Permitting (Supplemented) <br />4.2 NEPA/SEPA Documentation (Supplemented) <br />Additional NEPA/SEPA documentation services include: <br />The Subconsultant will assist the City with preparation, research, and coordination as required by <br />WSDOT for NEPA and for SEPA clearances. <br />Work Elements: <br />• Supplemental WSDOT coordination due to partial cultural resources exemption. <br />4.6 Extra Services — ESA 4(d) & Shoreline Permit (New Subtask) <br />Additional Environmental Permitting tasks include additional documentation and permitting as <br />required by WSDOT. The original assumption that Endangered Species Act compliance would <br />be demonstrated as 'No Effect" through use of the WSDOT NEPA CE form checklist was <br />incorrect as determined by WSDOT. Reviewing the project action through 4(d) maintenance <br />program provisions as requested by WSDOT requiring support information. Shoreline permit <br />jurisdiction research and JARPA documentation was additionally requited by the City. <br />Work Elements: <br />• 4(d) support information and WSDOT coordination. <br />Page I2 <br />City of Everett — Edgewater Bridge Replacement <br />