My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022/08/03 Council Agenda Packet
>
Council Agenda Packets
>
2022
>
2022/08/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2023 4:34:15 PM
Creation date
8/4/2022 11:21:01 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Assist City with preparation of JARPA form for final Shoreline Permit review. <br />Task 11 Civil, Roadway & Drainage Design <br />11.1 Stormwater Analysis (Supplemented) <br />Additional stormwater design and analysis services include: <br />Drainage Report <br />The Subconsultant will prepare an updated draft drainage report incorporating the additional <br />detention pipe design as requested by the City and the additional design of the HDPE <br />conveyance pipe daylighting at the southwest corner of the bridge that is out of the original <br />Scope of Seivices. The draft drainage report will include the additional detention pipe and <br />conveyance pipe daylight designs in the following sections: wi itten assessment and summary of <br />the surface water design features of the project, summary of tables, flow control calculations, <br />pipe capacity calculations, pipe anchor calculations, and supporting exhibits. <br />Deliverables: <br />• Draft Drainage Report at 90% PS&E phase (electronic PDF copy) <br />• Final Drainage Report <br />11.2 Detention Pipe <br />The Subconsultant will modify the detention pipe location and update calculations to be included <br />in the drainage report to incorporate the new detention pipe design as requested by the City. <br />Revisions to the plans, opinion of cost, and specifications due to the detention pipe will be <br />performed under another subtask of this supplement. <br />Work Elements: <br />• Coordination with the City, including preparing alternate design exhibits for coordination <br />meetings. <br />• Revisions to calculations for flow control and pipe conveyance. <br />Deliverables: <br />• Exhibits detailing alternate locations and sizes of detention pipe (electronic PDF copy) <br />• Flow control calculations (to be included in the Drainage Report provided under Subtask <br />11.1 of this scope of services) <br />• Pipe conveyance calculations (to be included in the Drainage Report provided under <br />Subtask 11.1 of this scope of services) <br />11.3 HDPE Conveyance Pipe Daylight Design <br />Page I3 <br />City of Everett — Edgewater Bridge Replacement <br />
The URL can be used to link to this page
Your browser does not support the video tag.