Laserfiche WebLink
The Subconsultant will include the HDPE conveyance pipe daylight design located near the <br />southwest corner of the bridge and perform calculations to be included in the diainage report to <br />incorporate the new HDPE pipe daylight design that was not part of the original Scope of <br />Services. Revisions to the plans, opinion of cost, and specifications due to the HDPE conveyance <br />pipe daylight design will be performed under another subtask of this supplement. <br />Work Elements: <br />• Coordination with the City. <br />• Calculations for HDPE pipe anchors and conveyance. <br />Deliverables: <br />• HDPE Pipe anchor and conveyance calcs (to be included in the Drainage Report under <br />Subtask 11.1 of this scope of services) <br />11.4 Pre -Ad Ready Plans and Opinion of Cost <br />Additional plans and opinion of cost services include two additional Pre -Ad Ready (titled "Pre - <br />Ad Ready and "Pre -Ad Ready Rev 1") submittals of the plans, specifications, and opinion of <br />cost and addressing review comments provided by the City for the Pre -Ad Ready submittal. <br />Additional services include: <br />The Subconsultant will revise the plans, specifications, and opinion of cost to incorporate the <br />additional designs of the detention pipe and HDPE conveyance pipe developed under Subtasks <br />16.1 and 16.2 of this Scope of Services and address the City's comments on the Pre -Ad Ready <br />PS&E submittal. The plans and specifications will be submitted to TranTech to be incorporated <br />into the rest of both of the Pre -Ad Ready PS&E packages prepared by others. <br />Work Elements: <br />• Design: The Subconsultant will revise the drainage and roadway restoration designs as <br />requested by the City. The drainage design revisions include the detention pipe and <br />HDPE pipe designs developed under Subtasks 16.1 and 16 2 of this Scope of Services. <br />The roadway restoration design revisions include updates to the removal and paving <br />limits, pavement grading, guardrail, channelization and park restoration. <br />• Plans: The Subconsultant will revise all civil plans to incorporate the revised designs <br />listed above. The Subconsultant will piovide plans to TranTech to be incorporated into <br />the 90% PS&E set. <br />• Specifications: The Subconsultant will all civil Contract Provisions ("Specifications") to <br />incorporate the revised designs listed above. The Subconsultant will provide special <br />provisions to TranTech to be incorporated into the 90% PS&E set. <br />• Internal QA/QC: An internal Subconsultant quality assurance/quality control review of <br />deliverables will be conducted for each Pre -Ad Ready submittal package, as well as <br />Page I4 <br />City of Everett — Edgewater Bridge Replacement <br />