My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022/08/03 Council Agenda Packet
>
Council Agenda Packets
>
2022
>
2022/08/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2023 4:34:15 PM
Creation date
8/4/2022 11:21:01 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
8/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
confirmation that comments received have been addressed. A record of comments <br />received will be maintained. Response to each comment received will be tracked to <br />confirm that they have been addressed. <br />• Review and address review comments on the Pre -Ad Ready submittal and incorporate <br />into the Pre -Ad Ready Rev 1 design plans specifications, and opinion of cost <br />Assumptions: <br />• A maximum of two (2) Pre -Ad Ready plans, specifications, and opinion of costs will be <br />prepared. <br />Deliverables: <br />• Pre -Ad Ready Plans (half-size [11' x17"]) submitted in PDF to the Consultant to be <br />incorporated into the plan set detailed in the original scope of services via e-mail <br />• Pre -Ad Ready electronic copy of the Special Provisions submitted in Microsoft Word to <br />the Consultant via e-mail <br />• Pre -Ad Ready electronic copy of the Opinion of Cost submitted in Microsoft Excel to the <br />Consultant via e-mail <br />Pre -Ad Ready Rev 1 Plans (half-size [11' x17"]) submitted in PDF to the Consultant to be <br />incorporated into the plan set detailed in the original scope of services via e-mail <br />• Pre -Ad Ready Rev 1 electronic copy of the Special Provisions submitted in Microsoft <br />Word to the Consultant via e-mail <br />• Pre -Ad Ready Rev 1 electronic copy of the Opinion of Cost submitted in Microsoft Excel <br />to the Consultant via e-mail <br />• <br />Services Not Included in Work Element 11 <br />• Public outreach efforts <br />The City shall furnish the following: <br />Record drawing redline markups reviewed and prepared, and ready for drafting <br />Page 15 <br />City of Everett — Edgewater Bridge Replacement <br />
The URL can be used to link to this page
Your browser does not support the video tag.