My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> replacement value thereof and include earthquake. The policy shall be endorsed to <br /> cover the interests, as they may appear, of the City, Contractor and subcontractors <br /> of all tiers with the City and sub-contractors listed as a Named Insured. In the event <br /> of a loss to any or all of the work and/or materials therein and/or to be provided at <br /> any time prior to the final close-out of the Contract and acceptance of the project by <br /> the City, the Contractor shall promptly reconstruct, repair, replace or restore all work <br /> and/or materials so destroyed. Nothing herein provided for shall in any way excuse <br /> the Contractor or its surety from the obligation of furnishing all the required materials <br /> and completing the work in full compliance with the terms of the Contract. <br /> 1-07.20 Patented Devices, Materials, and Processes <br /> Delete the first paragraph of 1-07.20 and substitute the following: <br /> The Contractor shall assume all costs arising from the use of patented devices, <br /> materials, or processes used on or incorporated in the Work, and agrees to indemnify, <br /> defend, and save harmless the City, and its officers, employees and agents from all <br /> actions of any nature for, or on account of the use of any patented devices, materials, or <br /> processes. <br /> 1-07.23 Public Convenience and Safety <br /> Delete the last sentence of the first paragraph of 1-07.23 and substitute the following: <br /> Nothing contained in this Contract is intended to create any third-party beneficiary rights <br /> in favor of the public or any individual utilizing the facilities being constructed or improved <br /> under this Contract. <br /> 1-07.23(1) Construction Under Traffic <br /> Revise the third sentence of the second paragraph to read as follows: <br /> Do NOT impair accessibility to existing or temporary pedestrian push buttons. City <br /> may allow activating pedestrian recall timing or other accommodations during <br /> construction. <br /> Supplement 1-07.23(1) by adding the following: 1 <br /> Should Contractor find these lane closures too restrictive, Contractor is directed to <br /> 1-08.0(2) HOURS OF WORK regarding weekend working hours. <br /> All cross streets shall remain open to traffic, except 52nd St, while working in the <br /> intersection, as indicated on the plans. <br /> Evergreen Way lane closure restrictions: <br /> Lane closures will not be allowed between 2:30 p.m. and 5:30 pm on weekdays.lf <br /> Engineer determines the permitted closure hours adversely affect traffic, the <br /> Engineer may adjust the hours accordingly. The Engineer will notify the Contractor <br /> in writing of any change in the closure hours. <br /> No lane closures will be allowed on a holiday or holiday weekend, or after 12:00 <br /> p.m. on a day prior to a holiday or holiday weekend. A holiday weekend is defined <br /> as having a holiday fall on Friday, Saturday, Sunday or Monday. <br /> Contractor shall provide a uniformed off-duty Police Officer to control traffic in critical <br /> situations as determined by the Engineer. The uniformed officer shall be paid under <br /> contract item "Traffic Control —Off-Duty Police Officer." <br /> Contractor shall notify the local Fire, Police and Engineering Departments before <br /> the beginning of each phase of construction so that these agencies may re-route <br /> their emergency vehicles around the construction zone. The non-emergency phone <br /> number for Everett Police is 258-2484, for Fire Dispatch is 257-8757, and for Public <br /> Works Engineering is 257-8800. <br /> Water Main Replacement"W" Division 1 —GENERAL REQUIREMENTS April,2022 <br /> WO No.—UP3766 SP—88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.