My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> the Contractor that the right of way or easement is available or that the right of entry has <br /> been received. If the Contractor is delayed due to acts of omission on the part of the <br /> City in obtaining easements, rights of entry or right of way, the Contractor will be entitled I <br /> to an extension of time. The Contractor agrees that Delay resulting from City obtaining <br /> easement or right of entry or right of way shall not be a breach of Contract. <br /> Each property owner shall be given 48 hours notice prior to entry by the Contractor. This <br /> includes entry onto easements and private property where private improvements must <br /> be adjusted. <br /> The Contractor shall be responsible for providing, without expense or liability to the City, <br /> any additional land and access thereto that the Contractor may desire for temporary <br /> construction facilities, storage of materials, or other Contractor needs. However, before <br /> using any private property, whether adjoining the Work or not, the Contractor shall file <br /> with the Engineer a written permission of the private property owner, and, upon vacating <br /> the premises, a written release from the property owner of each property disturbed or <br /> otherwise interfered with by reasons of construction pursued under this Contract. The <br /> statement shall be signed by the private property owner, or proper authority acting for <br /> the owner of the private property affected, stating that permission has been granted to <br /> use the property and all necessary permits have been obtained or, in the case of a <br /> release, that the restoration of the property has been satisfactorily accomplished. The <br /> statement shall include the parcel number, address, and date of signature. Written <br /> releases shall be filed with the Engineer before the Completion Date will be established. <br /> 1-07.27 No Waiver of State's Legal Rights ' <br /> Delete 1-07.27 and substitute the following: <br /> 1-07.27 No Waiver of City's Legal Rights <br /> (******) <br /> The City shall not be precluded or estopped by any measurement, estimate, or certificate <br /> made either before or after the completion and acceptance of the Work and payment therefor <br /> from showing the true amount and character of the Work performed and materials furnished <br /> by the Contractor, or from showing that any such measurement, estimate, or certificate is <br /> untrue or incorrectly made, or that the Work or materials do not conform in fact to the <br /> Contract. The City shall not be precluded or estopped, notwithstanding any such <br /> measurement, estimate, or certificate, and payment in accordance therewith, from recovering <br /> from the Contractor and the Sureties such damages as it may sustain by reason of the <br /> Contractor's failure to comply with the terms of the Contract. Neither the acceptance by the <br /> Engineer nor any payment for the whole or any part of the Work, nor any extension of time, <br /> nor any possession taken by the City shall operate as a waiver of any portion of the Contract <br /> or of any power herein reserved or any right to damages herein provided, or bar recovery of <br /> any money wrongfully or erroneously paid to the Contractor. A waiver of any breach of the <br /> Contract shall not be held to be a waiver of any other or subsequent breach. <br /> The Contractor and the City recognize that the impact of overcharges to the City by the I <br /> Contractor resulting from antitrust law violations by the Contractor's suppliers or <br /> Subcontractors adversely affects the City rather than the Contractor. Therefore, the <br /> Contractor agrees to assign to the City all claims for such overcharges. I <br /> 1-08 PROSECUTION AND PROGRESS <br /> Supplement Section 1-08 by adding the following: <br /> Water Main Replacement"W" Division 1 —GENERAL REQUIREMENTS April, 2022 <br /> WO No.—UP3766 SP—90 <br />
The URL can be used to link to this page
Your browser does not support the video tag.