Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Bid Item 22 - Dispose of Existing Fire Hydrant <br /> Measurement and Payment: Unit Price per Each (EA) <br /> The unit contract price for Remove Existing Fire Hydrant shall constitute full compensation <br /> for all labor, materials, tools and equipment necessary for removing and disposing of the <br /> existing hydrant and for removing auxiliary gate valve box after COE Water Department <br /> personnel closes gate valve, and cutting, capping existing hydrant lead pipe, providing and <br /> compacting backfill in-place. <br /> Bid Item 23 - Salvage Existing Fire Hydrant <br /> Measurement and Payment: Unit Price per Each (EA) <br /> The unit contract price for Salvage Existing Fire Hydrant shall constitute full compensation <br /> for all labor, materials, tools and equipment necessary for salvaging the existing hydrant, <br /> and delivering it to the City Storage Yard on Railroad Avenue and for removing auxiliary <br /> gate valve box after COE Water Department personnel closes gate valve, and cutting, <br /> capping existing hydrant lead pipe, providing and compacting backfill in-place. <br /> Bid Item 24 - Assist COE in Connecting to Existing Watermain <br /> Measurement and Payment: Unit Price per Each (EA) <br /> The unit contract price to Assist COE in Connecting to Existing Watermain shall constitute <br /> full compensation for all labor, materials, tools and equipment necessary for connection to <br /> existing system, in accordance with 7-09.3(19)A including, yet not limited to; all costs for <br /> traffic control, excavation, shoring, dewatering, haul and disposal of excavated materials, <br /> furnishing, installing and compacting bedding and backfill materials; labor and equipment <br /> required for the complete installation of the connection as specified. <br /> Unit contract price shall include all coordination efforts with the City and assistance as City <br /> forces make the actual connection. Connection of a water service line to the watermain <br /> and connection of new water service line to existing water service line will not be <br /> considered a connection to the existing system. <br /> Bid Item 25 - Corporation Stop w/Service Saddle, 1-inch <br /> Measurement and Payment: Unit Price per Each (EA). <br /> The unit contract price for Corporation Stop w/Service Saddle, -Inch shall constitute full <br /> compensation for all labor, materials, tools and equipment necessary for installation of a <br /> new corporation stop and service saddle in accordance with Parts A and B of Detail 1/D1 of <br /> the Plans, including yet not limited to, furnishing and installing the service saddle and <br /> corporation stop; trench excavation and dewatering, pavement removal, backfill and <br /> compaction; and testing the connection. <br /> Bid Item 26 - Service Saddle and Valve Assembly, 2-inch <br /> Measurement and Payment: Unit Price per Each (EA) <br /> The unit contract price for Service Saddle and Valve Assembly, 2-Inch, shall constitute full <br /> compensation for all labor, materials, tools, and equipment necessary for providing <br /> assembly in accordance with Parts A, B, C, and L of COE Standard Drawing No. 502 <br /> including yet not limited to, furnishing and installing the service saddle, brass nipple, gate <br /> valve, valve box; trench excavation and dewatering, pavement removal, backfill and <br /> compaction; and testing the connection. <br /> Note: This unit price will also apply to furnishing and installing blind flange, 2-inch NST tap <br /> and connecting to the 2-inch HDPE pipe shown on Detail 5, Drawing D1. <br /> Water Main Replacement"W" Division B-BID DESCRIPTIONS April,2022 <br /> WO No.-UP3766 SP-9 <br /> I <br />