My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> 1-07.2 State Sales Tax 75 <br /> I 1-07.3 Fire Prevention and Merchantable Timber Requirements 76 <br /> 1-07.5 Environmental Regulations 77 <br /> 1-07.6 Permits and Licenses 77 <br /> I 1-07.9 Wages 77 <br /> 1-07.11 Requirements for Nondiscrimination 79 <br /> 1-07.14 Responsibility for Damage 80 <br /> I 1-07.17 Utilities and Similar Facilities 82 <br /> 1-07.18 Public Liability and Property Damage Insurance 84 <br /> 1-07.18 Insurance (******) 88 <br /> I 1-07.20 Patented Devices, Materials, and Processes 88 <br /> 1-07.23 Public Convenience and Safety 88 <br /> 1-07.24 Rights of Way 89 <br /> Il-07.27 No Waiver of State's Legal Rights 90 <br /> 1-07.27 No Waiver of City's Legal Rights (******) 90 <br /> 1-08 PROSECUTION AND PROGRESS 90 <br /> I 1-08.0 Preliminary Matters 91 <br /> 1-08.1 Subcontracting 92 <br /> 1-08.3 Progress Schedule 93 <br /> I1-08.4 Prosecution of Work 97 <br /> 1-08.4 Notice to Proceed and Prosecution of Work (******) 97 <br /> 1-08.5 Time for Completion 99 <br /> I1-08.6 Suspension of Work 101 <br /> 1-08.7 Maintenance During Suspension 101 <br /> 1-08.8 Extensions of Time 102 <br /> I1-08.9 Liquidated Damages 103 <br /> 1-08.10 Termination of Contract 103 <br /> 1-08.11 Record Drawings (******) 107 <br /> I1-09 MEASUREMENT AND PAYMENT 108 <br /> 1-09.1 Measurement of Quantities 108 <br /> 1-09.3 Scope of Payment 109 <br /> I 1-09.4 Equitable Adjustment 109 <br /> 1-09.5 Deleted or Terminated Work 111 <br /> I 1-09.6 Force Account 112 <br /> 1-09.7 Mobilization 112 <br /> 1-09.9 Payments 113 <br /> I 1-09.9 Payments to Contractors (******) 113 <br /> 1-09.11 Disputes and Claims 117 <br /> 1-09.11 A Remedies (******) 121 <br /> I 1-09.12 Audits (******) 125 <br /> 1-09.13 Claims Resolution 127 <br /> 1-09.14 Patents and Royalties (******) 127 <br /> Il-lU TEMPORARY TRAFFIC CONTROL 127 <br /> 1-10.1 General 127 <br /> Water Main Replacement"W" Table of Contents - April 2022 <br /> IWO No.-UP3766 SP -iii <br />
The URL can be used to link to this page
Your browser does not support the video tag.