My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Quilceda Excavation 8/1/2022
>
Contracts
>
Capital Contract
>
Quilceda Excavation 8/1/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2024 2:43:55 PM
Creation date
8/5/2022 1:10:21 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Quilceda Excavation
Approval Date
8/1/2022
Council Approval Date
6/1/2022
Department
Public Works
Department Project Manager
Amie Roshak
Subject / Project Title
Water Main Replacement "W"
Public Works WO Number
UP3766
Tracking Number
0003444
Total Compensation
$1,843,150.92
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Quilceda Excavation, Inc. 2/12/2024 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
468
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> 1-10.2 Traffic Control Management 127 <br /> 1-10.3 Traffic Control Labor, Procedures and Devices 128 <br /> 1-10.3 Flagging, Signs, and All Other Traffic Control Devices (******) 128 <br /> 1-10.4 Measurement 131 <br /> 1-10.4 Measurement 131 <br /> 1-10.5 Payment 131 <br /> 1-10.5 Payment (******) 131 <br /> ADD NEW SECTION 1-11 131 I <br /> 1-11 MISCELLANEOUS (******) 131 <br /> 1-11.1 Construction 131 <br /> 1-11.2 Applicable Law and Choice of Forum 132 <br /> 111 <br /> 1-11.3 Severability 132 <br /> 1-11.4 Headings for Convenience 132 <br /> 1-11.5 Waiver 132 <br /> 1-11.6 City of Everett Business License 132 <br /> 1-11.7 Compliance with Federal, State and Local Laws 132 <br /> 1-11.8 Complete Agreement 132 <br /> 1-11.9 Successors Bound 132 <br /> 1-11.10 Effective Date 132 <br /> 1-11.11 Contractor Registration 132 <br /> DIVISION 2 - EARTHWORK 133 <br /> 2-01 CLEARING, GRUBBING AND ROADSIDE CLEANUP 133 <br /> 2-01.2 Disposal of Usable Material and Debris 133 <br /> 2-01.4 Measurement 133 <br /> 2-01.5 Payment 133 I <br /> 2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS 133 <br /> 2-02.1 Description 133 <br /> 2-02.3 Construction Requirements 133 <br /> 2-02.4 Vacant 136 <br /> 2.02.4 Measurement 136 <br /> 2-02.5 Payment 136 <br /> 2-03 ROADWAY EXCAVATION AND EMBANKMENT 136 <br /> 2-03.1 Description 136 <br /> 2-03.2 Vacant 137 <br /> 2.03.2 Materials 137 <br /> 2-03.3 Construction Requirements 137 <br /> 2-03.4 Measurement 138 <br /> 2-03.5 Payment 138 <br /> 2-04 HAUL 138 <br /> 2-04.1 Description 138 <br /> 2-04.3 Vacant 138 <br /> 2-04.3 Construction Requirements 138 <br /> 2-04.4 Measurement 138 <br /> Water Main Replacement"W" Table of Contents - April 2022 <br /> WO No.-UP3766 SP -iv <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.