Laserfiche WebLink
City of Everett <br />Task 300 —Design <br />Objectives <br />To provide bid -ready plans, specifications, and opinion of probable construction costs (OPCC) <br />based on the selected improvements from the Pre -Design Analysis task. <br />BHC Services <br />The design services for this task will be conducted under four (4) separate subtasks (permitting <br />support, 50 percent design, 90 percent design, and final design). The work to be included under <br />each subtask is as follows: <br />Subtask 301 — Permitting Support <br />1. Prepare a draft SEPA checklist for review by the City. Incorporate City comments into a <br />final version of the SEPA checklist. <br />2 Address Ecology comments on the engineering report by preparing draft responses to <br />comments for City review. Incorporate City feedback into final responses. If necessary, <br />prepare a revised version of the engineering report. Address any impacts to design in <br />the 50 percent design submittal. <br />3. Address Ecology comments on the 90 percent design submittal, which will be submitted <br />to Ecology for review and approval. Prepare draft responses to Ecology comments for <br />City review. Incorporate City feedback into final responses. Address any impacts to <br />design in the final construction bid documents. <br />Subtask 302 - Fifty (50) Percent Design: <br />1. Prepare 50 percent design level drawings including: general sheets and plan views and <br />major sections for demo, civil, structural, and mechanical sheets. <br />2. Prepare 50 percent design level specifications including: table of contents, major <br />material specifications, earthwork specifications, construction constraints and sequence, <br />and temporary facilities and controls. <br />3. Prepare 50 percent design level opinion of probable construction cost. <br />4. Prepare updated project schedule. <br />5. Perform a QA/QC review of the 50 percent design submittal. QA/QC review will be <br />performed by the project manager and a senior or principal level engineer not directly <br />involved in the design efforts. <br />6. Submit 50 Percent Design Submittal including plans, specifications, opinion of probable <br />construction cost, and project schedule to the City for review. <br />7. One (1) site visit assumed necessary for investigation/confirmation of site conditions to <br />support preparation of the 50 Percent Design Submittal. <br />8. One (1) meeting with the City to review the 50 Percent Design Submittal and discuss <br />City review comments. BHC will prepare notes to document decisions. <br />Subtask 303 -Ninety (90) Percent Design: <br />1. Address 50 Percent Design Submittal City review comments. Prepare and submit a <br />Record of Comment to clearly address the resolution to each City review comment. <br />2. Prepare 90 percent design level drawings, which includes initial development of all <br />drawings. <br />Scope of Services i. <br />bhc <br />CONSULTANTS <br />