My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
TranTech Engineering LLC 8/11/2022 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
TranTech Engineering LLC 8/11/2022 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2022 11:17:38 AM
Creation date
8/12/2022 11:16:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
TranTech Engineering LLC
Approval Date
8/11/2022
Council Approval Date
8/3/2022
End Date
12/31/2026
Department
Public Works
Department Project Manager
Tom Hood
Subject / Project Title
Edgewater Creek Bridge Replacement
Public Works WO Number
PW3694
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0002205
Total Compensation
$3,509,212.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Document Relationships
TranTech Engineering LLC 1/31/2020
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Assumptions: <br /> 1. OWNER will provide a project manager to respond to the CONSUTANT questions <br /> and approval of any potential contract changes, material over-runs, and differing site <br /> conditions. <br /> 2. OWNER will assume management of stakeholders and public relations. <br /> 3. OWNER will execute and manage the FOR construction engineering support services <br /> contract. <br /> 4. The appropriate Engineers of Record will review shop and falsework drawings. <br /> Deliverables: <br /> 1. RFI responses limited to 100 RFIs; Facilitate responses to requests for information <br /> (RFIs) and submittals, ensuring response timelines are met for both. Maintain RFI <br /> and submittal log to track status and responses <br /> 2. Prepare and print agendas for weekly progress meetings internally and with the <br /> Contractor, attend the meeting, and take meeting minutes. Distribute meeting minutes <br /> to attendees. <br /> 3. Preparation of preconstruction conference agendas for Drilled shafts, difficult <br /> concrete placement, and bridge deck. Review and approval of drilled shafts cross <br /> sonic logging(CSL)test results. <br /> 4. Preparation of risk log and monthly updates tracking and construction cost to <br /> complete. <br /> 5. Lump sum breakdown review and acceptance. Also, evaluate design changes, design <br /> clarifications and other requested deviations from approved design and/or coordinate <br /> evaluations and interpretations with the appropriate authorities. <br /> 6. Review, track, analyze and comment on contractors' Baseline and ongoing update <br /> schedules including two-week look ahead. <br /> 7. Entitlement determination, negotiations, correspondence to contractor, change order <br /> preparation and back up documentation limited to 30 Change orders. <br /> 8. Resolution of end of construction issues including compensation for approved <br /> outstanding contract changes, liquidated damages, and claims. <br /> Page 19 <br /> City of Everett—Edgewater Bridge Replacement <br />
The URL can be used to link to this page
Your browser does not support the video tag.