Laserfiche WebLink
Task 1 —Project Management(Supplemented) <br /> This task includes project administration, meeting coordination, and design team management. <br /> Work Elements: <br /> • Consultant Team Meetings—approximately nine (9) additional team meetings are <br /> assumed for the additional design services. <br /> • Monthly Progress Reports and Invoicing—approximately eighteen (18)progress reports <br /> containing a narrative that identifies and describes significant activities performed in the <br /> previous month. <br /> • Design Team Management—below is a list of continued tasks to be provided for the <br /> duration of the additional design: <br /> • Schedule and coordinate with design team. <br /> • Monitor project budget. <br /> • Maintain regular informal contact telephone discussions and electronic mail. <br /> Deliverables: <br /> • Invoices and Progress Reports <br /> Task 4—Environmental Permitting(Supplemented) <br /> 4.2 NEPA/SEPA Documentation (Supplemented) <br /> Additional NEPA/SEPA documentation services include: <br /> The Subconsultant will assist the City with preparation, research, and coordination as required by <br /> WSDOT for NEPA and for SEPA clearances. <br /> Work Elements: <br /> • Supplemental WSDOT coordination due to partial cultural resources exemption. <br /> 4.6 Extra Services—ESA 4(d) & Shoreline Permit(New Subtask) <br /> Additional Environmental Permitting tasks include additional documentation and permitting as <br /> required by WSDOT. The original assumption that Endangered Species Act compliance would <br /> be demonstrated as "No Effect"through use of the WSDOT NEPA CE form checklist was <br /> incorrect as determined by WSDOT. Reviewing the project action through 4(d)maintenance <br /> program provisions as requested by WSDOT requiring support information. Shoreline permit <br /> jurisdiction research and JARPA documentation was additionally required by the City. <br /> Work Elements: <br /> • 4(d) support information and WSDOT coordination. <br /> Page 12 <br /> City of Everett—Edgewater Bridge Replacement <br />