My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tastad Construction 8/18/2022
>
Contracts
>
Capital Contract
>
Tastad Construction 8/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2023 10:39:41 AM
Creation date
8/19/2022 3:26:38 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Tastad Construction
Approval Date
8/18/2022
Council Approval Date
7/20/2022
Department
Facilities
Department Project Manager
Brad Chenoweth
Subject / Project Title
Silver LakeTrail Project
Public Works WO Number
PW-2022-075
Tracking Number
0003458
Total Compensation
$873,705.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Change Order 1 Tastad Construction
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Tastad Construction 6/27/2023 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
573
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 00 73 00 - 1 <br /> t <br /> SECTION 00 73 00 - SPECIAL CONDITIONS <br /> i <br /> PART 1 -GENERAL <br /> 1.1 SUMMARY <br /> ' A. The following "Special Conditions" shall supplement the General Conditions and shall <br /> become a part of this contract: <br /> PART 2 -WORKING HOURS <br /> 2.1 General Contractor will be required to provide a project schedule that clearly defines <br /> each phase of work including planned facility closure(s), length of time area(s) is/are to <br /> be closed, and projected reopening of affected area(s). <br /> 2.2 Work Hours: The Contractor shall provide work schedule. Facility will be partially <br /> ' occupied during construction. The Contractor will have full access to facility. <br /> A. The City has established regulations for control of noise in residential zoned property. <br /> For the purpose of regulating potential disruptive or annoying noise, Ordinance No. <br /> Ii 556-89 states that all residential zoned land fall within Noise Control No. 1. <br /> 1. Therefore, it should be noted that under the City's Noise Ordinance, construction <br /> related noise is limited to the following hours: <br /> ' a.b. 7:00 AM to 10:00 PM on weekdays <br /> 8:00 AM to 6:00 PM on weekends and state recognized holidays <br /> ' 2.3 Be aware that all construction sites will be monitored and violators are subject to fines. <br /> 2.4 Construction contractors are responsible for notifying subcontractors of the City's noise <br /> regulations. <br /> i2.5 (Discussion of altering business operating schedule will be determined at Pre- <br /> Construction Meeting) Other hours may be considered on a limited basis without <br /> interruption of Owner's normal operations (Owner will determine if proposed work may <br /> interrupt Owner's operations). All requests for working hours other than those stated <br /> above shall be made exclusively through the Owner's Representative. <br /> ' PART 3 - Not Used <br /> END OF SECTION 00 73 00 <br /> 00 73 00- 1 SPECIAL CONDITIONS <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.