My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tastad Construction 8/18/2022
>
Contracts
>
Capital Contract
>
Tastad Construction 8/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2023 10:39:41 AM
Creation date
8/19/2022 3:26:38 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Tastad Construction
Approval Date
8/18/2022
Council Approval Date
7/20/2022
Department
Facilities
Department Project Manager
Brad Chenoweth
Subject / Project Title
Silver LakeTrail Project
Public Works WO Number
PW-2022-075
Tracking Number
0003458
Total Compensation
$873,705.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Change Order 1 Tastad Construction
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Tastad Construction 6/27/2023 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
573
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> City of Everett 01 11 00 - 2 <br /> B. "N.I.C." Items indicated "NIC" shall be furnished and installed bythe Owner, orother <br /> by <br /> Contracts. <br /> 1.3 WORK BY THE OWNER <br /> A. The Owner shall have the right to access the site and execute work not included in the 1 <br /> Contract concurrent with this contract period. Contractor shall cooperate with such <br /> Owner sponsored efforts. <br /> 1.4 PERMITS <br /> A. The Owner will pay the cost of the general plan review and building permit. The ' <br /> Contractor shall be responsible to obtain and pay the cost of various other permits and <br /> connection fees required such as mechanical, plumbing and electrical permits or <br /> connection fees and such shall be included in the Bid. <br /> 1.5 CODES AND STANDARD SPECIFICATIONS I <br /> A. All construction shall be in accordance with the International Building Code, Current <br /> Adopted Edition. <br /> B. All construction shall be in accordance with the Uniform Mechanical Code, Uniform <br /> Plumbing Code, Uniform Fire Code, and the Uniform Electrical Code, latest editions. <br /> C. All construction shall be in accordance with the Washington State Energy Code, latest <br /> editions. <br /> D. All construction shall be in accordance with the Everett Municipal Code Title 16. Latest <br /> editions. <br /> E. All construction shall be in conformance with the WSDOT/APWA Standard ' <br /> Specifications and Standard Plans, latest edition. <br /> F. All construction shall be in conformance with the City of Everett Design and Construction <br /> Standards and Specifications, latest edition. <br /> G. All work shall comply with applicable requirements of Snohomish County. <br /> H. Any material specified by reference to the number, symbol, or title of a specified <br /> standards, such as Commercial Standard Federal Specifications, a trade association <br /> standard, or other similar standard, shall comply with the requirements of the latest <br /> revision thereof, and any amendment or supplement thereto in effect on the date of <br /> Invitation for Bids, except as limited to type, class or grade, or modified in such <br /> references. All work shall conform to the standard referred to, except as modified in <br /> these specifications and the drawings. <br /> 1.6 CONTRACTOR'S USE OF PREMISES 1 <br /> 01 11 00 - 2 SUMMARY OF WORK 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.