My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Herrera Environmental Consultants Inc. 8/27/2022
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Herrera Environmental Consultants Inc. 8/27/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2022 11:50:30 AM
Creation date
9/30/2022 11:49:41 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Herrera Environmental Consultants Inc.
Approval Date
8/27/2022
Council Approval Date
8/17/2022
End Date
7/31/2027
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
Landfill Gas Collection- Ops & Mgmt Services
Tracking Number
0003466
Total Compensation
$276,293.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUBTASK 3.1 - LFG SYSTEMS O&M MANUAL FOR THE <br /> CITY (PROJECT NUMBER 22-07824-100) <br /> An O&M Manual will be prepared for all City maintained LFG system components. The O&M <br /> Manual will be prepared for the City and their responsibility for the LFG systems installed on the <br /> Site, in Riverfront Boulevard, in 415t Street, and around the perimeter (inclusive of the blower <br /> facilities). This O&M will exclude the area in and under the buildings as well as the portions of <br /> the low permeability barrier that Riverfront paid to install. Herrera will review existing <br /> operational practices and O&M manuals on existing facilities such that a revised and compiled <br /> operations manual exists for all their landfill systems. <br /> Assumptions <br /> • O&M Manual to include: <br /> o Decision Trees <br /> o Maintenance flow charts and check lists <br /> o Maintenance responsibilities <br /> o Alarm response responsibilities <br /> o Emergency response responsibilities <br /> o General Site Health and Safety Plan <br /> Deliverables <br /> O&M Manual in PDF format and 3 hard copies. <br /> TASK 4.0 - BUILDING SYSTEMS FOR RIVERFRONT <br /> (PROJECT NUMBER 22-07824-000) <br /> Riverfront will own and is responsible for the O&M of the LFG systems in and under the <br /> buildings, and for maintenance of low permeability barriers where Riverfront paid for their <br /> installation (throughout the development area and Riverfront Boulevard). Herrera will provide <br /> the O&M related to these systems for Riverfront in a similar format as for Task 3.0. <br /> O&M activities and maintenance frequency are detailed in Table 3. <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.