Laserfiche WebLink
Table 3. Building O&M Requirements. <br /> O&M Component O&M Activity Frequency <br /> Observe condition of interior concrete slabs and <br /> exterior sidewalks around perimeter of building <br /> Cement Concrete Maintenance noting newly formed cracks or the expansion of Yearly <br /> existing cracks. <br /> Venting Pipe Valves Exercise each valve. Quarterly <br /> Methane Monitoring Sensors Inspect Sensors and exercise alarms. Quarterly <br /> and Alarms <br /> Methane Monitoring Sensors Response Check for Recalibration 6 months <br /> Methane Monitoring Sensors Response Check for Recalibration and response <br /> located in ground floor spaces of check for ground floor space exhaust fan 6 months <br /> Work/Live Units activation <br /> With a handheld sensor, identify any locations <br /> Surface Monitoring around with methane concentrations exceeding Every 2 weeks for first 3 <br /> Exterior 500 parts per million. Investigate and eliminate months,then Quarterly <br /> source. <br /> With a handheld sensor, identify any locations <br /> Surface Monitoring of Ground with methane concentrations exceeding Every 2 weeks for first 3 <br /> Level Interior 100 parts per million. Investigate and eliminate months,then Quarterly <br /> source. <br /> Boots and Sealants around Visually inspect for any cracks or damage. Repair Every 6 Months <br /> Penetrations per manufacturer's instructions. <br /> Herrera may also design modifications to the Building LFG System that are needed to <br /> ensure proper operation of the system components. Herrera will provide site visits, as <br /> requested, for related system observation, sampling, and monitoring. Herrera will <br /> provide technical oversight as needed and requested by Riverfront. <br /> Assumptions <br /> • Building O&M activities detailed in Table 3 will be performed by Herrera and will begin <br /> when Buildings A and B are online which is anticipated for third quarter of 2023. <br /> • Surface air monitoring in the interior and around the exterior will be sampled by Herrera. <br /> • A SEM 5000 unit, provided by Riverfront, will be used for all surface monitoring events, <br /> logging methane concentration readings in 5-second increments. Data will be saved in <br /> EXCEL format. <br /> • Calibration gases for the SEM 5000 and the buildings methane monitoring sensors will <br /> be provided by Herrera. <br /> • Buildings A and B are assumed to come online at close enough dates in 2023 that <br /> surface monitoring for the 2 week intervals during the first 3 months will occur at the <br /> same time for both Buildings. <br /> • The surface monitoring data from the Buildings will be saved with the data from Task 2.0. <br /> Quarterly and Annual Summary Reports of all Task 2.0, 3.0, 4.0, and 4.2 data will be <br /> prepared as part of Task 2.0. <br /> 8 <br />