Laserfiche WebLink
• Up to 24 hours of design modification assistance. Effort in excess of 24 hours will be <br /> processed through a change order. <br /> • Design modification memorandums as required <br /> Deliverables <br /> Surface monitoring summary memo after each monitoring event. <br /> Field inspection reports after each inspection visit. <br /> SUBTASK 4.1 - BUILDING AND Low PERMEABILITY <br /> BARRIER O&M MANUAL FOR RIVERFRONT <br /> (PROJECT NUMBER 22-07824-000) <br /> An O&M Manual will be prepared for the building and low permeability barrier systems. The <br /> O&M Manual will be prepared for Riverfront and their responsibility for the LFG systems <br /> installed within and below the developed buildings in addition to the components the low <br /> permeability barrier that they paid to install. <br /> Assumptions <br /> • O&M Manual to include: <br /> o Decision Trees <br /> o Maintenance flow charts and check lists <br /> o Maintenance responsibilities <br /> o Visual inspection and repair requirements <br /> o Alarm response responsibilities <br /> o Emergency response responsibilities <br /> o General Building Health and Safety Plan <br /> Deliverables <br /> O&M Manual in PDF format and 3 hard copies. <br /> 9 <br />