My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Military Dept 6/29/2022
>
Contracts
>
6 Years Then Destroy
>
2024
>
WA ST Military Dept 6/29/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:19 AM
Creation date
9/30/2022 1:15:25 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Military Dept
Approval Date
6/29/2022
Council Approval Date
6/22/2022
End Date
4/30/2024
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
Evergreen Pump Station Permanent Generator
Public Works WO Number
D22-024
Tracking Number
0003456
Total Compensation
$946,895.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Specific additional documentation requirements for projects to acquire properties for open space <br /> include, but are not limited to, the following: <br /> • Signed Statement of Voluntary Participation from owner of each acquired property. <br /> • Documentation of dates of acquisition and structure demolition or removal from property for <br /> each property. <br /> • Copy of recorded open space deed restrictions for each acquired property. <br /> • Copy of AW-501 form filed with National Flood Insurance Program for each acquired repetitive <br /> loss property. <br /> • Documentation of consultation with Army Corps of Engineers and State Department of <br /> Transportation regarding future use of each property. <br /> Specific additional documentation requirements for projects to elevate structures above the base <br /> flood elevation include, but are not limited to, the following: <br /> • Photographs of the structures prior to elevation, and front, rear and side photos post-elevation. <br /> • Copies of the pre-project elevation certificate for each structure, or documentation of <br /> methodology used to calculate the first-floor elevations. <br /> • Copies of the post-project elevation certificate for each structure. <br /> • Copies of certificate of occupancy for each elevated structure to certify that it is code <br /> compliant. <br /> • Certification by an engineer,floodplain manager or other senior official of the SUBRECIPIENT <br /> that each completed structural elevation is in compliance with local ordinances and National <br /> Flood Insurance Program regulations and technical bulletins. <br /> • Copy of AW-501 form filed with National Flood Insurance Program for each elevated repetitive <br /> loss property. <br /> • Copies of proof of flood insurance for each elevated structure. <br /> • Copies of the recorded deed restriction related to maintenance of flood insurance for each <br /> property within the Special Flood Hazard Area. <br /> The DEPARTMENT will consult with the SUBRECIPIENT regarding other documentation <br /> requirements of the Agreement throughout the Period of Performance. <br /> The SUBRECIPIENT is required to retain all documentation which adequately identifies the <br /> source and application of all mitigation grant funds for six years following the closure of this grant. <br /> For all funds received, source documentation includes adequate accounting of actual costs and <br /> recoveries incurred. <br /> 10. LIMITED ENGLISH PROFICIENCY (CIVIL RIGHTS ACT OF 1964 TITLE VI) <br /> All SUBRECIPIENTs must comply with the Title VI of the Civil Rights Act of 1964 (Title VI) <br /> prohibition against discrimination on the basis of national origin, which requires that <br /> SUBRECIPIENTs of federal financial assistance take reasonable steps to provide meaningful <br /> access to persons with limited English proficiency(LEP)to their programs and services. Providing <br /> meaningful access for persons with LEP may entail providing language assistance services, <br /> including oral interpretation and written translation. Executive Order 13166, Improving Access to <br /> Services for Persons with Limited English Proficiency (August 11, 2000), requires federal <br /> agencies to issue guidance to recipients, assisting such organizations and entities in <br /> understanding their language access obligations. DHS published the required recipient guidance <br /> in April 2011, DHS Guidance to Federal Financial Assistance Recipients Regarding Title VI <br /> Prohibition Against National Origin Discrimination Affecting Limited English Proficient Persons, <br /> 76 Fed. Reg. 21755-21768, (April 18, 2011). The Guidance provides helpful information such as <br /> how a recipient can determine the extent of its obligation to provide language services; selecting <br /> language services; and elements of an effective plan on language assistance for LEP persons. <br /> For additional assistance and information regarding language access obligations, please refer to <br /> the DHS Recipient Guidance at https://www.dhs.gov/guidance-published-help-department- <br /> supported-organizations-provide-meaninqful-access-people-limited and additional resources on <br /> http://www.lep.gov. <br /> Mitigation Project Grant Agreement Page 7 of 29 City of Everett, D22-024 Revised <br /> Form 4/17/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.