My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WA ST Military Dept 6/29/2022
>
Contracts
>
6 Years Then Destroy
>
2024
>
WA ST Military Dept 6/29/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 7:10:19 AM
Creation date
9/30/2022 1:15:25 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
WA ST Military Dept
Approval Date
6/29/2022
Council Approval Date
6/22/2022
End Date
4/30/2024
Department
Public Works
Department Project Manager
Hanna Lintukorpi
Subject / Project Title
Evergreen Pump Station Permanent Generator
Public Works WO Number
D22-024
Tracking Number
0003456
Total Compensation
$946,895.00
Contract Type
Agreement
Contract Subtype
Interlocal Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11. ADDITIONAL SPECIAL CONDITIONS <br /> a. Construction Documents, Contracts, Change Orders <br /> Construction Document Approval: The SUBRECIPIENT agrees to submit one <br /> copy of all construction plans and specifications to the DEPARTMENT for review <br /> and approval prior to solicitation of bids for construction. <br /> ii. The SUBRECIPIENT shall use a competitive procurement process in the <br /> procurement and award of any contracts with contractors or sub-contractors that <br /> are entered into under the original contract award. The procurement process <br /> followed shall be in accordance with 2 CFR Part 200.318 General procurement <br /> standards through 200.326 Contract Provisions. Copies of all bids and contracts <br /> awarded shall be submitted to the DEPARTMENT upon request. Where all bids <br /> are substantially in excess of project estimates, the DEPARTMENT may, by notice <br /> in writing, suspend the project for determination of appropriate action, which may <br /> include termination of the Agreement. <br /> iii. Construction Change Order: All change orders must be in writing and shall be <br /> submitted to the DEPARTMENT. The SUBRECIPIENT shall pay any increase in <br /> the cost of the project as the result of a change order, unless the DEPARTMENT <br /> has agreed to the change with a written amendment to this Agreement. <br /> 12. EQUIPMENT AND SUPPLY MANAGEMENT <br /> a. If applicable, SUBRECIPIENTs and any non-federal entity to which the SUBRECIPIENT <br /> makes a subaward shall comply with 2 CFR 200.318—200.326, to include but not limited <br /> to: <br /> Upon successful completion of the terms of this Agreement, all equipment and <br /> supplies purchased through this Agreement will be owned by the SUBRECIPIENT, <br /> or a recognized non-federal entity to which the SUBRECIPIENT has made a <br /> subaward, for which a contract or other means of legal transfer of ownership is in <br /> place. <br /> ii. All equipment, and supplies as applicable, purchased under this Agreement will be <br /> recorded and maintained in the SUBRECIPIENT's inventory system. <br /> iii. Equipment records shall include: a description of the property; the manufacturer's <br /> serial number, model number, or other identification number; the source of the <br /> equipment, including the Federal Award Identification Number (FAIN); Assistance <br /> Listing number; who holds the title; the acquisition date; the cost of the equipment <br /> and the percentage of Federal participation in the cost; the location, use and <br /> condition of the equipment at the date the information was reported; and <br /> disposition data including the date of disposal and sale price of the property. <br /> iv. The SUBRECIPIENT shall take a physical inventory of the equipment and <br /> reconcile the results with the property records at least once every two years. Any <br /> differences between quantities determined by the physical inspection and those <br /> shown in the records shall be investigated by the SUBRECIPIENT to determine <br /> the cause of the difference. The SUBRECIPIENT shall, in connection with the <br /> inventory, verify the existence, current utilization, and continued need for the <br /> equipment. <br /> v. The SUBRECIPIENT shall be responsible for any and all operational and <br /> maintenance expenses and for the safe operation of their equipment and supplies <br /> including all questions of liability. The SUBRECIPIENT shall develop appropriate <br /> maintenance schedules and procedures to ensure the equipment and supplies are <br /> well maintained and kept in good operating condition. <br /> vi. The SUBRECIPIENT must obtain and maintain all necessary certifications and <br /> licenses for the equipment. <br /> Mitigation Project Grant Agreement Page 8 of 29 City of Everett, D22-024 Revised <br /> Form 4/17/2020 <br />
The URL can be used to link to this page
Your browser does not support the video tag.