EXHIBIT A <br /> Task 200 Assumptions: <br /> 1. The maximum estimated CS bypass flows set forth in the CS Conveyance Study <br /> are correct (110 mgd from the headworks bypass and 122 mgd from the primary <br /> clarifier bypass). <br /> Task 200 Meetings: <br /> 1. Review meetings with City staff for Tasks 201 through 205. <br /> 2. Workshop to select preferred option (Task 206). <br /> 3. Alternatives Comparison Report review meeting. <br /> Task 200 Deliverables: <br /> 1. Task memorandums for Tasks 201 through 206. <br /> 2. Alternatives Comparison Report. <br /> TASK 300 —PREDESIGN PHASE (TO BE ADDED BY AMENDMENT) <br /> Task 301 —Refine the Preferred Project Concepts (for permitting applications) <br /> Task 302—Conduct Geotechnical Exploration Program (confirm materials in <br /> embankments) <br /> Task 303—Prepare Permit Applications and Environmental Documents, as appropriate <br /> (to get permitting started for work in or near wetlands) <br /> Task 304— Update Project Cost Estimate and Schedule <br /> TASK 400 - DESIGN PHASE (TO BE ADDED BY AMENDMENT) <br /> Task 401 — Design (detailed design of structures and conveyance conduits) <br /> Task 402—Prepare Construction Contract Documents (specifications and drawings) <br /> Task 403— Update Project Cost Estimate and Schedule <br /> pw:WA\Everett\_Proposals\Combined Sewage Conveyance Improvements\Admin\WPCF CS Bypass Project doc Page 5 of 5 <br />