My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Carollo Engineers Inc. 9/19/2022
>
Contracts
>
6 Years Then Destroy
>
2023
>
Carollo Engineers Inc. 9/19/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2022 9:11:18 AM
Creation date
10/14/2022 9:10:36 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Carollo Engineers Inc.
Approval Date
9/19/2022
Council Approval Date
9/7/2022
End Date
12/31/2023
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
WPCF Combined Conveyance Improvement
Public Works WO Number
UP3799
Tracking Number
0003500
Total Compensation
$98,854.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> Task 200 Assumptions: <br /> 1. The maximum estimated CS bypass flows set forth in the CS Conveyance Study <br /> are correct (110 mgd from the headworks bypass and 122 mgd from the primary <br /> clarifier bypass). <br /> Task 200 Meetings: <br /> 1. Review meetings with City staff for Tasks 201 through 205. <br /> 2. Workshop to select preferred option (Task 206). <br /> 3. Alternatives Comparison Report review meeting. <br /> Task 200 Deliverables: <br /> 1. Task memorandums for Tasks 201 through 206. <br /> 2. Alternatives Comparison Report. <br /> TASK 300 —PREDESIGN PHASE (TO BE ADDED BY AMENDMENT) <br /> Task 301 —Refine the Preferred Project Concepts (for permitting applications) <br /> Task 302—Conduct Geotechnical Exploration Program (confirm materials in <br /> embankments) <br /> Task 303—Prepare Permit Applications and Environmental Documents, as appropriate <br /> (to get permitting started for work in or near wetlands) <br /> Task 304— Update Project Cost Estimate and Schedule <br /> TASK 400 - DESIGN PHASE (TO BE ADDED BY AMENDMENT) <br /> Task 401 — Design (detailed design of structures and conveyance conduits) <br /> Task 402—Prepare Construction Contract Documents (specifications and drawings) <br /> Task 403— Update Project Cost Estimate and Schedule <br /> pw:WA\Everett\_Proposals\Combined Sewage Conveyance Improvements\Admin\WPCF CS Bypass Project doc Page 5 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.