Laserfiche WebLink
o Develop drawing details. <br /> o Develop building code required Special Inspection sheets. <br /> o Continued coordination with mechanical for all components to finalize the configuration <br /> of the structure. <br /> o Continued coordination with mechanical and electrical for opening requirements, <br /> equipment and pipe supports. <br /> o Coordination with geotechnical for final geotechnical recommendation design. <br /> o Evaluation for final sizing of walls, slabs, beams and columns. <br /> Corrosion Protection <br /> o Coordinate with project team to make corrosion protection recommendations <br /> pertaining to the CSO storage tank structure and appurtenances. <br /> o Develop coatings specification. <br /> Architectural <br /> o Development of plans and sections for equipment shelters. <br /> o Develop drawing details. <br /> Mechanical and Odor Control <br /> o Advance plans and specification for mechanical components to 60%, incorporate City <br /> comments from 30% drawings. <br /> ■ Basin drain pumps <br /> ■ Gates <br /> ■ Tipping buckets <br /> ■ Utility water system <br /> ■ Odor control System <br /> - Fan <br /> - Mist eliminator <br /> - Odor Control Vessel <br /> - Silencer <br /> - Discharge stack <br /> o Refine equipment list. <br /> o Finalize Fan and pumping calculations. <br /> Electrical <br /> o Continued utility coordination with Snohomish PUD. <br /> o Develop one-line diagram. <br /> o Develop equipment layout schematic. <br /> o Determine conduit routings. <br /> o Preliminary control diagrams. <br /> o Coordination with other disciplines, Structural,Architectural, Process/Mechanical, l&C. <br /> o Preliminary illumination design. <br /> April 2022 Page 22 of 35 Jacobs Engineering Group <br />