My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Jacobs Engineering Inc. 11/3/2022 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Jacobs Engineering Inc. 11/3/2022 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/10/2022 10:25:50 AM
Creation date
11/10/2022 10:24:31 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Jacobs Engineering Inc.
Approval Date
11/3/2022
Council Approval Date
2/3/2021
End Date
12/31/2026
Department
Public Works
Department Project Manager
Candice Au-Yeung
Subject / Project Title
CSO Storage at 36th ST Detailed Design
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0002775
Total Compensation
$2,814,996.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
Jacobs Engineering Group Inc. 2/8/2021
(Amendment)
Path:
\Records\City Clerk\Contracts\6 Years Then Destroy\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o Develop drawing details. <br /> o Develop building code required Special Inspection sheets. <br /> o Continued coordination with mechanical for all components to finalize the configuration <br /> of the structure. <br /> o Continued coordination with mechanical and electrical for opening requirements, <br /> equipment and pipe supports. <br /> o Coordination with geotechnical for final geotechnical recommendation design. <br /> o Evaluation for final sizing of walls, slabs, beams and columns. <br /> Corrosion Protection <br /> o Coordinate with project team to make corrosion protection recommendations <br /> pertaining to the CSO storage tank structure and appurtenances. <br /> o Develop coatings specification. <br /> Architectural <br /> o Development of plans and sections for equipment shelters. <br /> o Develop drawing details. <br /> Mechanical and Odor Control <br /> o Advance plans and specification for mechanical components to 60%, incorporate City <br /> comments from 30% drawings. <br /> ■ Basin drain pumps <br /> ■ Gates <br /> ■ Tipping buckets <br /> ■ Utility water system <br /> ■ Odor control System <br /> - Fan <br /> - Mist eliminator <br /> - Odor Control Vessel <br /> - Silencer <br /> - Discharge stack <br /> o Refine equipment list. <br /> o Finalize Fan and pumping calculations. <br /> Electrical <br /> o Continued utility coordination with Snohomish PUD. <br /> o Develop one-line diagram. <br /> o Develop equipment layout schematic. <br /> o Determine conduit routings. <br /> o Preliminary control diagrams. <br /> o Coordination with other disciplines, Structural,Architectural, Process/Mechanical, l&C. <br /> o Preliminary illumination design. <br /> April 2022 Page 22 of 35 Jacobs Engineering Group <br />
The URL can be used to link to this page
Your browser does not support the video tag.